1 9
3062087_0207
Selecting the pump stage
The boiler is equipped with a three-stage pump that is set to
stage 2 in the delivered condition.
The minimum circulation volume is ensured by a connection
line between the flow and return. An automatic overflow valve
and a manually adjustable bypass valve are integrated into the
connection line.
In the delivered condition, the bypass valve is fully opened to
"MAX". Closing the valve can increase the residual head (see
diagram).
Fig.: Pump rate stages at the heating circuit pump
Bypass valve
Stage 1
Stage 2
Stage 3