Operating instructions for leaf blower
15
Operation
English
Operation
Operating times
Observe the regional regulations.
Enquire at your local authority regarding
permitted operating times.
Charging
After approx. 45 minutes the 3 Ah battery has
a charge capacity of 80% and is fully charged
after approx. 70 minutes. After approx. 80 minutes
the 5 Ah battery reaches a charge capacity of 80%
and is fully charged after approx. 110 minutes.
Use only the original WOLF-Garten charger
(part no. see “Spare parts” list)!
Use the charger in dry rooms only!
Press on the yellow button to detach
the battery
.
Take the battery out of the leaf blower using
your other hand
.
Connect the charger to the socket
(~230 V) an
.
Plug the battery into the battery charger
.
Re-insert the fully charged battery into the unit
.
Information about charging
– The red LED indicates that the charger is connec-
ted to the mains voltage (~230 V).
When the battery has been inserted:
– The green flashing LED indicates the charging
process.
– The green LED indicates that the charging
process is complete and the battery is fully
charged.
– The red flashing LED indicates an error message:
Flashes slowly = battery is too warm.
The charging process starts automatically
at the correct operating temperature.
Flashes quickly = battery is defective.
Have battery tested at a service centre.
– The red LED indicates an error message:
Battery is not being charged.
Battery has not been inserted correctly
or the contacts are dirty.
General information about the battery
If the battery voltage is low, the unit switches
off automatically. In this case recharge
the battery.
Charge lithium-ion batteries before long breaks,
e.g. prior to storage in the winter.
The lithium-ion battery can be charged whatever
the battery charge and charging can be interrup-
ted at any time without damaging the battery
(no memory effect).
Charge indicator lamp
The battery has a charge indicator lamp which
indicates the charge capacity of the battery.
Press the small black button on the battery
to read off the charge capacity.
Now pay attention to the LED display
of the battery.
Information on the charge indicator lamp
– A green LED indicates that the battery has
a charge capacity of only max. 33% and should
be recharged as soon as possible
.
– Two green LEDs indicate that the battery
has a charge capacity of 66%
.
– When all LEDs light up green, the battery
has a charge capacity of 100% and is fully
charged
.
– If a red LED is lit, have the battery tested
by a qualified technician or a service centre.
Assembly
The leaf blower is delivered in three parts
.
First connect the two individual parts of the blow
pipe
and then place it on the leaf blower
housing
.
You can now start working.
Working with the leaf blower
Hold and operate the leaf blower as shown in Fig.
.
Switching on/off
The leaf blower has a yellow thumbwheel which
can be used to steplessly adjust the blowing speed.
Depending on the application, the leaf blower can
be operated at a reduced air flow or high air flow.
Turn the wheel forwards to switch the leaf blower
on and to increase the air flow.
Use a high blowing speed to blow heavy leaf litter,
e.g. twigs or wet foliage, into heaps.
Turn the wheel backwards to reduce the air flow.
Use a reduced blowing speed to blow light leaf
litter, e.g. foliage or fir needles, into heaps.
Switch the leaf blower off by turning the wheel
backwards until it engages.