background image

Flatfire  

Direct Vent Gas Fireplace 

 

Mounting the Flatfire 

 

 

o

essary mounting and 

n. 

emplate to the wall 

place is to be 

that the fireplace 
Use a spirit level 

ounting 

plate 

unting holes are level. 

 lower mounting holes that you 

p nail, 

 

3. 

cribe the circle later. 

ly 

5. 

 
 
 
 

 

 

 
 
 

 
 

 
 

 

      

  

 fireplace 

., 

n). 

2. 

3. 

 

4. 

wall covering along the 

in 

if 

5. 

 

. The 

tuds. 

7. 

ugh 

8. 

 
 
 
 

INITIAL SETUP 

Once you are certain that the location you have
ch sen meets all the nec
safety requirements, you can begin the installatio

1.  Tape or pin the installation 

ere the fire

t

in the position wh
mounted. Note: It is important 

 

is mounted in a level position.
placed on the cross-hairs in the upper m

ate, and adjust the tem

holes on the templ
position until the mo
Refer to the illustration below. 

2.  Next, carefully transfer the location of the two 

upper and two
will use for your installation. Use a shar
awl or pin to pierce the template on the
mounting hole cross-hairs to insure an accurate 
transfer to your wall. 

Next transfer the location for the center of the 
vent pass-through hole on the wall. Also 
transfer at least one point on the diameter of 
the vent pass-through circle. This will make it 
easier to s

4.  Finally, transfer the location of the gas supp

line. 

Remove the template and circle the transferred 
locations with a pencil or marker. 

 
 

 

 

 

 

MOUNTING HOLES 

 

 

            OUTER HOLES 24” OC 

 

 

             INNER HOLES 16” OC 

 
 

 

      

GAS SUPPLY 

  CUTOUT 

INSTALLATION ON AN OUTSIDE WALL 

Assembly steps for Vent Pass-Through (Parallel 
Wall Installation on an Outside Wall): 

1.  An unobstructed wall pass-through is required 

to allow for a safe installation of the
vent components. This will necessitate remova
of a portion of the interior wall covering (e.g
sheetrock or plaster and lath), outer wall 
sheathing and outer wall covering and any 
adjacent internal wall materials (like insulatio

Scribe a 9

” diameter hole around the vent 

pass-through center mark using a compass. 

Use a long drill (

” diameter) that is held 

square and level to the inside wall to transfer 
the vent pass-through center location from the
inner wall covering through to the outer wall 
sheathing and outer wall covering. 

Carefully cut the inner 
scribed line and remove the circular wall piece.  
 
Note: It is important to locate electrical wiring 
the wall before beginning the installation 
process. An electrician should be consulted 
there is any question about wiring locations. 
Failure to locate and protect wiring during the 
installation process my result in electrical shock 
or fire. 

Remove any insulation materials from wall in 
the area defined by the pass-through hole. 

6.  Building codes in your area may require that 

you add blocking above and below the vent 
opening. The blocking should be above and 
below the 9

” vent opening you made in the

wall and should not obstruct that opening
blocking should extend to adjacent wall s

Next, mark and cut a 9

” diameter hole thro

the outer wall covering and sheathing using the 
locating hole you drilled in Step 2. 

Follow the instructions included with the vent 
termination (cap) to remove the appropriate 
amount of outer wall covering (siding) or to 
install the vinyl siding shield if used.  
 
Do not install the chimney cap at this point. 

Page 12 of 25 

Version 10-09

 

Summary of Contents for Flatfire FF-NG

Page 1: ...om heating appliance It must not be used for any other purposes such as drying clothes etc WARNING If the information in these instructions is not followed exactly a fire or explosion may result causi...

Page 2: ...NG THE BURNER GLASS MEDIA 15 RELIEF DOOR INSTALLATION 15 INSTALLING THE FRONT GLASS FRAME 16 INSTALLING THE OUTER PANELS 16 INSTALLING THE FIREPLACE SURROUND 16 Gas Connection 17 GAS SUPPLY LINE 17 GA...

Page 3: ...eration Due to the high temperature the appliance ould be LOCATED out of traffic areas and away from Any safety screen or guard removed for servicing MUST furniture and draperies Clothing or flammabl...

Page 4: ...how the fireplace is It is recommended that the pilot flame be turned n een certified by OMNI Test SA This appliance is equipped for use with the fuel type indicated on the rating plate 70 If than ut...

Page 5: ...ombustible flooring is measured from the top surface of carpeting tile etc Mounting plate thimbles 5 16 8mm thick contact the wall Installation a ld be done by a qualified service person The appliance...

Page 6: ...vent run The total venting may not exceed 60 feet of vertical rise and or 20 feet horizontal run Custom testing is available for installations ov the limits for approvals Refer to the Venting Chart on...

Page 7: ...ontal termination or if more than 12 of horizontal vent run is required some vertical vent be required for the fireplace to function and vent GAS VENTING CHART prope install to a maximum of four 90 lb...

Page 8: ...TOTA L 90 ELBOWS EQUIVALENT D E x G 90 ELBOWS IN EXCESS OF 2 F 2 H ADDITIONAL HORIZONTAL FEET EQUIVALENT FEE G x 3 T I TOTAL HORIZ NT L V NT UN O A E R equivalent FEE C H T TER TIO C P YPE ORIZONTAL...

Page 9: ...RNATIVES he illustration below shows some of the many ways the Flatfire fireplace may be installed in the home This includes interior and exterior wall insta ontal and vertical vent terminations T lla...

Page 10: ...e Direct Vent Gas Fireplace Flatfire Direct Vent Gas Fireplace Page 10 of 25 Version 10 09 VENT TERMINAL CLEARANCES Venting terminals should not be recessed into a wall or siding Page 10 of 25 Version...

Page 11: ...and limitations that must be met for the location of the vent terminal relative to doors windows corners eaves gas supply components and other structural elements of the house Refer to the specific r...

Page 12: ...ructed wall pass through is required to allow for a safe installation of the vent components This will necessitate remova of a portion of the interior wall covering e g sheetrock or plaster and lath o...

Page 13: ...h square and level to the inside wall to transfer the vent pass through center location from the inner wall covering through to the wall covering on the back side of the partition wall Carefully cut...

Page 14: ...e you have achieved a level position 10 The next step is to install the vent starter pipe onto the fireplace First you should remove the glass frame from the front of the firebox by unclipping the cli...

Page 15: ...the proper amount of glass material to cover the burner Empty the entire contents of the and distribute evenly over the burner tray Locate the burner in the fireplace Clip a corn of the poly bag to fo...

Page 16: ...e top front edge of the left side panel and align with the PEM nut in the front of the top panel Insert the Philips head screw Make sure the edges of the pan aligned with the edges of the top panel an...

Page 17: ...Line nection to Control Valve Inlet and the mmended location for Shut off Valve GAS CONNECTION 1 Verify that the gas type is correct for the fireplace by looking at the rating plate that i atta Note T...

Page 18: ...emoving the two mounting straps as they will not be used Be sure the arrow on the cap if present is pointing up and rec all the vent cap location requirements and the vent manufacturer s requirements...

Page 19: ...tion of the vent components The pipe sections may have twist lock connections which Be sure that the two vent pipe heat shields extend at least 2 beyond the rear side of the partition wall adjacent to...

Page 20: ...ire is lit The ames should span vertically across the fireplace 2 3 ty 4 ntrol valve shown above e b On the touch pad shown at right located on right of the the ignition is in progress c Once pilot ig...

Page 21: ...the pilot will not stay lit after several tries turn the gas control knob 1 to OFF 3 and call your local service technician or gas supplier d If the pilot is press button A to increa press button C t...

Page 22: ...IMER Timer Mode Appliance must be in stan allo dby mode pilot ignited The Timer setting ws you to set two 2 burner TEMP times and two 2 burner dTEMP times every 24 hours For dTE rmostat TEMP must be M...

Page 23: ...ce press the frame against the firebox while pushing down to be sure the frame is fully engaged in the frame retainer Hold the f in place and press it agai in the sides Replace the fireplace surround...

Page 24: ...o the first purchaser user of thi limitations in paragraph 3 Please review the c requirements 1 Extended Warranty Coverage For a period of up to ten 10 years Wittus In option pay the initial pur which...

Page 25: ...alled Fuel Natural Gas Liquid Propane Gas Inlet Pressure measured after Installation wc Manifold Pressure measured after Installation High Fire wc Low Fire wc Venting Vent Brand Selkirk Direct Temp EX...

Reviews: