background image

Summary of Contents for WSG09

Page 1: ...s Synchronous Lift Machines WITTUR Holding GmbH Rohrbachstrase 26 30 D 85259 Wiedenzhausen Germany Tel 49 0 81 34 18 0 r Fax 49 0 81 34 18 49 http www wittur com E mail info wittur com Wittur Holding...

Page 2: ...fo wittur com cn These operating instructions are applicable to lift machines WSG09 X with block brake Wittur Holding GmbH reserves the right to correct or change the contents of this manual and these...

Page 3: ...m ERN 1387 18 10 4 Brake 19 11 Commissioning 20 12 Operation and maintenance 21 12 1 General 21 12 2 Maintenance intervals 21 12 3 Lubricating instructions 22 12 4 Brake remote release for MRL solutio...

Page 4: ...sioning operation or maintenance r Operation of the WSG09 X with defective and or inop erative safety or protective devices Danger Warning Caution Note r Non compliance with the instructions contained...

Page 5: ...e r High surface temperatures may occur on the external parts of the machine Therefore no temperature sensitive parts may be in contact with these parts or attached to them Protection against accident...

Page 6: ...eave The rotor shaft is inserted into the stator frame and supported in a self aligning roller bearing 4 at the traction sheave side Above it there is a connection seats 5 which designed for mechanica...

Page 7: ...lift machine is on the motor The nameplate of the brake is on the brake Type Rated Speed Sheave Diameter Suspension Rated Voltage Rated Torque Rated Revolution Rated Frequency Rated Power Duty Protect...

Page 8: ...G 09 X XX X1 X2 X3X4 X5X6X7 X8X9 Synchronous motor Frame type Overall length Identifyed by 2 3 4 Customer specific identifer e g 01 1313 encoder with brake manual release with mechanism evacuation dev...

Page 9: ...ated Torque S3 40 240s h MN Sheave Dt loads Q nN PN IN UN F nN PN IN UN F 0 5 48 3 7 10 2 281 8 8 42 2 4 10 2 214 7 7 1 95 5 4 13 323 17 4 85 4 8 13 293 15 6 1 6 1 75 167 9 4 19 9 337 30 6 149 8 4 17...

Page 10: ...PN IN UN F nN PN IN UN F 0 5 48 3 7 12 3 281 8 8 42 3 3 12 5 261 7 7 1 95 7 4 18 5 311 17 4 85 6 6 18 5 288 15 6 1 5 143 11 1 25 323 26 2 127 9 8 25 250 23 3 1 75 167 12 9 30 302 30 6 149 11 5 25 277...

Page 11: ...DYH PP 3RVLWLRQ 6 URRYHV 6 6 21 05 2015 E Gearless Synchronous Lift Machines WSG09 X Operating and maintenance manual J40003 Page 11 Date Version Subject to changes without notice 6 Dimension drawing...

Page 12: ...ilated and vibration free rooms storage temperature 20 C to 60 C Do not store lift machines in the open air Parts are not suf ciently preserved to withstand extended periods of exposure Avoid excessiv...

Page 13: ...llation Ambient conditions The following ambient conditions must be ensured on site Altitude max 1 000 m a s l Ambient temperature 5 40 C Max rel humidity 85 at 20 C no moisture condensation Install t...

Page 14: ...o a converter with a maximum d c link Danger Note Terminal box for motor connection The motor cable must be shielded The motor phases U1 V1 and W1 must be connected correctly to the corresponding volt...

Page 15: ...ed with terminal pin conductor 1 When using the nominal cross sections with ferrules the usable cable cross section is reduced Technical data WSG09 2 09 3 1 0m s 2 5mm2 WSG09 2 09 3 1 5m s 4mm2 WSG09...

Page 16: ...40 1 0 mm2 13 1A 20 7 A 1 5 mm2 15 7 A 24 8 A 2 5 mm2 22 6 A 35 7 A 4 0 mm2 29 6 A 46 7 A 6 0 mm2 38 3 A 60 5 A PTC thermistor The operating voltage of the PTC thermistors is not allowed to exceed 25...

Page 17: ...G09 X lift machines is matched to the associated con verter Do not change the adjustment as this may make it impossible to use the motor Warning Note 10 3 1 Measuring system ECN 1313 EnDat 2048 Operat...

Page 18: ...uring system ERN 1387 2048 Operating voltage 5V Commutation signals sine and cosine 1b 7a 5b 3a 6b 2a 3b Up Sensor 0V Sensor Up 0V A A B 5a 4b 4a 7b 1a 2b 6a B R R C C D D 10 3 3 Measuring system 2048...

Page 19: ...ed and held with 110V DC 75 80V DC The recti er has to be prepared by customer Following is two recommend solution for the brake switching which must be realized by the control circuit from customer c...

Page 20: ...ction especially the earthing r Check that the temperature monitoring devices are properly connected and functioning r Check that the brakes are properly connected and that the brake monitoring switch...

Page 21: ...ons are to be strictly observed The operator is responsible for the proper installation of the motor with regard to safety requirements as well as for its inspection and maintenance as speci ed in the...

Page 22: ...ot provided with a re greasing device 12 4 Brake remote release for MRL solution A brake remote release system would be required when it is a MRL solution Besides the standard brake the system additio...

Page 23: ...A 79 Nm with a torque spanner r Replace the ropes and reinstall the rope slip off guard Danger 12 7 Brake Electromagnetic brakes is a kind of special product for lift using It is always pre adjusted b...

Page 24: ...c plate and moving plate turns smaller from originally 1 2 1 4mm as red square below 4 Relieve the cross screws to take out switch cover as red cycle below 5 When the gap is about 0 55mm use a feeler...

Page 25: ...en use the hand release to manually open the brake make sure the torque is lower than 68Nm 82Nm r After a long term period operation of the traction machine the braking lining may be abraded The brake...

Page 26: ...Loosen the clamping ring on the measuring system 2mm Allen screw r Remove the M5 fastening screw r Insert the M5x10 setscrew to protect the thread see gure and remove the measuring system by means of...

Page 27: ...he converter operating instructions Disassembly r Loosen the clamping ring on the measuring system 2mm Allen screw r Remove the M5x45 fastening screw r Insert the M5x10 setscrew to protect the thread...

Page 28: ...etrisation Braking system does not release r Braking system is not supplied with voltage r Check electrical connection r Brake magnet voltage too low r Check braking voltage supply voltage r Brake mec...

Page 29: ...ection Emerson Unidrive Yaskawa L1000 Schneider Altivar Monarch SIEI Meiden VT Xizitrust Micovert G11UD4C4 Lift iAstar KEB F5 Emerson CN7 Soder S9 Monarch Z320WSGS30010V0X Z320WSGS30008V0X Z320WSGS300...

Page 30: ...nsert to the hand wheel to mechanical Evacuation device to move the car by turning 13 3 Brake remote release In order to open the brake in the shaft a remote brake release system has to be ordered 13...

Page 31: ...X2 6 6 P UDNH 6 ZLWK UHPRWH UHOHDVH X2 6 6 P 5HPRWH UHOHDVH 0DQXDO UHOHDVH ZUHQFK 6 6 7UDFWLRQ VKHDYH JURRYHV 7UDFWLRQ VKHDYH JURRYHV 7UDFWLRQ VKHDYH JURRYHV 6KDIW ZLWK SLQLRQ 6 6 YDFXDWLRQ KDQG ZKHH...

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Page 37: ......

Page 38: ......

Page 39: ......

Page 40: ......

Page 41: ......

Page 42: ......

Page 43: ......

Page 44: ......

Page 45: ......

Page 46: ......

Page 47: ......

Reviews: