![WITTUR WSG-S2.4 Series Operating Instructions Manual Download Page 78](http://html1.mh-extra.com/html/wittur/wsg-s2-4-series/wsg-s2-4-series_operating-instructions-manual_990299078.webp)
Commissioning and operation
INTORQ | BA 14.0196 | 04/2016
40
6. Measure the DC voltage at the brake:
-
The measured DC voltage after the over-excitation time (see bridge/half-wave rectifier,
must correspond to the holding voltage (see table 5). A deviation of ±10 % is permissible.
7. Check the air gap “s
L
”.
-
It must be zero and the rotor must rotate freely.
8. Check the switching status of the micro-switch (see table 6).
9. Open the switching contact for the brake.
-
The brake is applied.
10. Check the switching status of the micro-switch (see table 6).
11. Switch off DC voltage for the brake.
12. Screw the bridges onto the motor terminals.
13. If necessary, remove the neutral conductor from the neutral point (step 2).
The preparations for commissioning are completed.
6.3
Commissioning
1. Switch on the drive system.
2. Carry out a braking test.
Contact type
Connection
Brake released
Micro-switch closed
NC contact
black / grey
yes
no
no
yes
NO contact
black / blue
yes
yes
no
no
Tab. 6:
Switching status of the micro-switch