1125100
WPC 1000 User Manual
2-44
Installation
4.
Using the conduit hole provided in the base of the One-hand Control, run conduit and
wiring to the Operator Station, referring to Figure 2-24 for terminal locations on the
bottom of the One-hand Control.
5.
Measure wires to fit before cutting, then make the appropriate wiring connections,
referring to Table 2-12, below, and Figure 1 at the end of the manual.
* Refer to Figure 2-24, above
6.
Fasten the switch cover onto the base with the screws provided.
7.
Tighten all conduit connections that may have been loosened during installation.
8.
Close and latch the cover of the Operator Station and WPC 1000.
9.
Make sure that you have run all your ground wires. Do not use conduit as ground.
Figure 2-24. Wiring Connections in One-hand Control Switch
(Switch Cover, Bottom View)
Table 2-12. One-hand Control Wiring Connections
One-hand Control
Terminal # *
WPC 1000 Control Board and
Operation Station Connections
Pin#
Signal
11
46
Palm switch N/C input +
12
Blue wire in Operator Station cable
13
4
One-hand input +
14
Blue wire in Operator Station cable
Summary of Contents for WPC 1000
Page 17: ...1125100 WPC 1000 User Manual xii Table of Contents ...
Page 99: ...1125100 WPC 1000 User Manual 2 72 Installation ...
Page 207: ...1125100 WPC 1000 User Manual A 18 Extracts from OSHA and ANSI ...
Page 217: ...1125100 WPC 1000 User Manual G 6 Glossary ...
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 233: ......
Page 234: ......
Page 235: ......