10
Connection Diagram
Position of the connections
A
Water drain
(softened water);
G ¾” external thread
B
Water supply (raw water)
G ¾“ exterior thread;
min. 1.5 bar; max. 6 bar;
max. 50 °C;
max. 29°dH total hardness
C
Regeneration water
½ ” hose; 2000 mm long
D
Safety overflow
½ ”connection
Connection Diagram
INFO
Items at Pos. 1 to 4 and Pos. 6 are not part of the MonoMatik 3 installation kit
A water safety device (4) must be used in order for the MonoMatik 3 to be operated in accordance with DIN requirements.
A kit is available from Winterhalter for this purpose.
The kit contains a backflow preventer type HD in accordance with DIN EN 1717.
National installation and operating regulations must also be complied with!
The system can also be installed in reverse.
Provide on-site connections next to the device
6
Waste water funnel with trap
5
Hose to warewasher
4
Water safety device
3
Supply
hose; 2 x G 3/4“ union nut
2
Dirt trap; 1 x G 3/4“ union nut; 1 x G 3/4“ external thread
1
Water stop cock on-
site, G 3/4“ external thread
89013502-00
Connection diagram
MonoMatik 3 softener
Prepared: 07.02.2017 sch
If space is limited, the water safety device (pos. 4) can also be
installed on to the incoming water supply.
Note:
- Top edge of the combination connector must be at least
110 mm above the top edge of the MonoMatik 3
- Vertical installation position
- Install in direction of flow
View from rear
View from front
Summary of Contents for MonoMatik 3
Page 1: ...MonoMatik 3 Operating instructions Connection diagram Commissioning instructions 7 12...
Page 2: ......
Page 9: ......