![WinGD X82-B Maintenance Manual Download Page 206](http://html1.mh-extra.com/html/wingd/x82-b/x82-b_maintenance-manual_986581206.webp)
7.1.2
Cylinder liner - remove
Periodicity
Description
Unscheduled
As necessary
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
2.0 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
AR
Support equipment
Description
Part No.
CSN
QTY
Eye bolt
94045-Mxx
2
Sling
94049A
2
Shackle
94018D
2
Lifting tool
94201
1
Plate
94201B
2
Lifting tool
94201A
2
Sling
94039-x-x
2
Supplies
Description
QTY
Molyslip Copaslip
A/R
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The engine must be stopped and made safe for maintenance, refer to section
maintenance work - general procedure
•
The cylinder cover must be removed, refer to section
•
The lubricating quills must be removed, refer to section
7.2.1 Lubricating quill - remove
•
The piston must be removed, refer to section
•
For a DF engine - the gas admission valves must be removed, refer to section
[section
not applicable for this engine]
X82-B
AA00-2124-00AAA-520A-A
Maintenance Manual
Cylinder liner - remove
Winterthur Gas & Diesel Ltd.
- 206 -
Issue 001 2020-10
Summary of Contents for X82-B
Page 825: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 1 9...
Page 826: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 2 9...
Page 827: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 3 9...
Page 828: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 4 9...
Page 829: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 5 9...
Page 830: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 6 9...
Page 831: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 7 9...
Page 832: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 8 9...
Page 833: ...Approved TIGHTENING INSTRUCTIONS Rev B Page 9 9...