Wilo Jet WJ Series Installation And Operation Instructions Manual Download Page 6

ENGLISH

Pos. 7

Pipe supports

Pos. 8

Strainer

Pos. 9

Storage tank

Pos. 10 Town water supply
Pos. 11 3~ motor protection relay
Pos. 12 OFF/ON switch for single phase motor (red indicator

light)

Pos. 13 Power plug (1~ -Motor)

4.2

Scope of supply

– Jet Pump (WJ)
– Installation and Operation instructions

4.3

Accessories

– Suction hose set

5 Sitting/lnstallation

5.1

Installation

The  pump  must  be  operated  in  strict  compliance  with  local
water supply regulations.

Requirements on installation location:

– easy to reach
– well vented, dry and frostfree
– Installation on a concrete socket or directly on a smooth and

horizontal floor

lt  is  the  Operators  responsibility  to  take  all  preventive  meas-
ures (e. g. provision of alarm systems, standby pump, etc.) to
avoid consequential damages such as flooding due to pump
failure.
– Suction  and  discharge  piping  to  be  provided  on  site  by

others.

– When using solid pipe connections the pump must be firmly

fixed to the floor.

– If not firmly fixed, flexible connectors must at least be used

for suction and discharge ports.

– The suction pipe must be fully airtight and be installed free of

stress, steadily rising towards the pump.

– Suction lifts above 5 metres require a suction pipe size of not

less than 1

[HH

.

– Discharge  pipe  connections  must  be  free  of  stress  on  the

pump.

In  order  to  ensure  proper  operation  a  static
discharge  head  of  30  cm  is  required;  the
discharge pipe must thus be installed with a rise
of at least 30 cm.

– A foot valve is required at the end of the suction line. lt must

be located not less than 30 cm below the lowest water level.
Recommended  is  the  use  of  a  suction  hose  set  (optional
extra) consisting of suction hose, suction strainer and foot
valve.

5.2

Electrical connection

All  electrical  work  to  be  carried  out  by  a  qualified
and  locally  licenced  electrician  in  strict  conformity
with locally ruling regulations.

30  mA  earth

fault  circuit  interruptors  should  be  used  for  the

electrical circuits to the pump.
– Regulations of VDE 0100, Part 702 must be observed for use

in conjunction with swimming pools or garden ponds.

– Electrical  plug  connections  must  be  made  in  flood-safe

locations and be protected from moisture.

– Check available power supply.
– Take note of pump name plate data requirements.
– Supply side fuse: 10A, inert action.
– Observe local earthing requirements.

ATTENTION!

Pumps must only be operated on electrical cables (also exten-
sion leads) conforming with local ruling standards.
– Three-phase  motors  to  be  wired  in  accordance  with  Fig.  3

(motor terminal wiring).

– Three-phase motors require the onsite provision and instal-

lation  by  others  of  an  external  thermal  overload  protection
device to be set to the F.L.C. value stated on the motor name
plate.

6 Commissioning

– Check to ensure that a sufficiently high water level is availa-

ble in the open break tank or bore. Dry-running of the pump
must  be  prevented  as  it  will  lead  to  destruction  of  the
mechanical seal.

– Fill pump and suction line via the fill plug. Only a filled pump

has self-priming capacity.

– Open discharge isolating valve(s) to allow free air evacuation

from the suction pipe.

– Three-phase motors require a rotation check:

Briefly switch on the pump and check whether actual direc-
tion of rotation corresponds with the arrow on the fan hood
of the motor. II necessary, change any two supply phases.

– Never use the power supply cable for lifting, transporting or

fixing of the pump.

– The pump must not be subjected to direct water spray.

7 Maintenance

Isolate  from  power  supply  before  checking  the
pump!
In principle, damage to the connecting cable should
only be repaired by a qualified electrician.

To  ensure  highest  operational  safety  and  reliability  at  lowest
possible cost the following routine checks are recommended:
– Check  on  diaphragm  vessel  pressure  (at  least  1.4  bar  on

standard settings of pressure switch).

– Check pump for leaks.
On danger of freezing it is necessary to completely drain the
pump using the drain plug at the bottom of the pump housing.
For prolonged standdown periods (e. g. winter shutdown) the
pump  needs  thorough  scouring,  complete  draining  and  dry
storage.
On  re-commissioning  check  tor  free  rotation  by  brieflyswit-
ching-on the pump. Then re-fill with water.

7

Summary of Contents for Jet WJ Series

Page 1: ...leitung GB Installation and Operation Instructions F Notice de montage et de mise en service NL Inbouw en gebruikshandleiding E Instrucciones de instalaci n y servicio I Istruzioni di montaggio uso e...

Page 2: ...Fig 1 Fig 2 Fig 3...

Page 3: ...en oorzaken en oplossing 14 I 1 Generalit 18 2 Sicurezza 18 3 Trasporto e magazzinaggio 18 4 Descrizione del prodotto e accessori 18 5 Montaggio installazione 19 6 Messa in servizio 19 7 Manutenzione...

Page 4: ...2...

Page 5: ...ing dangerous possibilities Failure of vital plant functions or damage to the pump Causing personal injury due to electrical and or mechanical causes 2 4 Safety reference for the Operator Local regula...

Page 6: ...ved for use in conjunction with swimming pools or garden ponds Electrical plug connections must be made in flood safe locations and be protected from moisture Check available power supply Take note of...

Page 7: ...itches off of the cuttent rating mentioned on the motor data plate Voltage is too low Check the adequate cross section of the electrical cable conductors A phase is cut Check it and change the electri...

Page 8: ...ity directive i d F as amended avec les amendements suivants Compatibilit lectromagn tique directive 91 263 EWG 92 31 EWG 93 68 EWG Niederspannungsrichtlinie 73 23 EWG Low voltage directive i d F as a...

Page 9: ...utrustning och maskin utomhus2000 14 EG Till mpade harmoniserade normer i synnerhet 1 DK EF overensstemmelseserkl ring Vi erkl rer hermed at denne enhed ved levering overholder f lgende relevante best...

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Reviews: