English COMMISSIONING
7.2.1. Venting the pump and piping (for closed pipe systems)
• Open all slide valves in the pressure pipe.
• Switch on the power supply (main switch or DC switch, see Section 6.5). Depending
on the available supply voltage (mains operation or solar power supply) the pump now
operates at maximum delivery rate.
The air escapes through the corresponding air vent valves. If air vent valves have not
been installed, check the taps so the air can escape here!
• Once the pump and pipe system have been vented, once again disconnect the pump
from the power supply and close any potentially open taps.
7.3. Operation
7.3.1. Before switching on
Check the following prior to switching on the submersible pump:
• Proper and secure cable routing (e.g. no loops)
•
Firm fit of all components (pump, piping, etc.)
• Operating conditions:
• Fluid temperature
• Immersion depth
• Open all the gate valves in the pressure pipe. The pump must not be switched on when
the slide valves are throttled or closed.
7.3.2. Switching on
• Switch on the power supply (DC switch, see Section 6.5). If the supply voltage is availa-
ble, the pump automatically switches on and off as per the operating conditions.
7.3.3. After having switched on
After having switched on the power supply and as soon as the minimum voltage requi-
red to operate the motor has been generated, the frequency converter starts up the
pump. Depending on the available power provided by the solar panels, the frequency
converter generates the maximum available speed.
If the voltage drops below the required minimum value, the frequency converter swit-
ches off the pump.
7.4. Conduct during operation
When operating the pump, always follow the locally applicable laws and regulations for
work safety, accident prevention, and handling electrical machinery. Operators must
clearly specify staff activities to guarantee safe operating processes. All personnel is
responsible for ensuring that regulations are observed.
The pump is equipped with moving parts. During operation, these parts rotate in order
to pump the fluid. Certain substances in the fluid can result in very sharp edges forming
on the moving parts.
Summary of Contents for Actun OPTI-QS Series
Page 2: ...Fig 1 QSI QSH 1 2 3 4 5 6 6 5 7 8...
Page 3: ...Fig 2 1 3 2 5 4 I O 1 3 2 7 8 6 5 4...
Page 4: ...Fig 3f Fig 3e Fig 3b Fig 3a Fig 3d Fig 3c 1 2 3 4 1 2 3...
Page 5: ...Fig 3h Fig 3g Fig 3j Fig 3i Fig 4b Fig 4a Fig 4c 3 1 4 3 2 5 6 1 7 6...
Page 6: ...Fig 6 Fig 5 2 4 3 1 2 3 1 6 G P PLQ P 7 8...
Page 7: ...Fig 7 2 5 m A A B 1 2 1...
Page 221: ...Wilo Actun OPTI QS 221 1 1 1 1 2 1 3 1 4 www wilo com legal...
Page 222: ...222 WILO SE 02 2019 DIN A5 2 2 1...
Page 223: ...Wilo Actun OPTI QS 223...
Page 224: ...224 WILO SE 02 2019 DIN A5 2 2 2 3...
Page 225: ...Wilo Actun OPTI QS 225 2 4 RCD RCD 2 5...
Page 226: ...226 WILO SE 02 2019 DIN A5 2 6 2 7 16 18...
Page 227: ...Wilo Actun OPTI QS 227 3 DIN EN 62638 Wilo 3 1...
Page 228: ...228 WILO SE 02 2019 DIN A5 TrinkwV ACS KTW 3 2 4 4 1 QSI QSH...
Page 230: ...230 WILO SE 02 2019 DIN A5 4 1 3 20 C 4 1 4 4 2 Wilo QS Stop Module 4 3...
Page 233: ...Wilo Actun OPTI QS 233 5 2...
Page 234: ...234 WILO SE 02 2019 DIN A5 5 3 1 Wilo Actun OPTI QS 20 C 50 C 5 C 25 C...
Page 235: ...Wilo Actun OPTI QS 235 6 5 4...
Page 236: ...236 WILO SE 02 2019 DIN A5 6 6 1 6 2...
Page 238: ...238 WILO SE 02 2019 DIN A5 6 Fig 3h 7 Fig 3i 60 Fig 3j 6 3 RCD 6 3 1...
Page 241: ...Wilo Actun OPTI QS 241 6 3 2 Wilo Actun OPTI QS Fig 5 Fig 5 Wilo Actun OPTI QS 1 2 3 4 6 4...
Page 242: ...242 WILO SE 02 2019 DIN A5 6 5 1...
Page 243: ...Wilo Actun OPTI QS 243 6 4 1 Fig 6 1 7 2x 2 8 3 9 4 Ls 5 Ld 6...
Page 244: ...244 WILO SE 02 2019 DIN A5 13 14 15 16 17 18 19 20 21...
Page 245: ...Wilo Actun OPTI QS 245 22 23 24 25 10 m 3 m...
Page 246: ...246 WILO SE 02 2019 DIN A5 6 4 2 1 2 3 4 5...
Page 247: ...Wilo Actun OPTI QS 247 6 6 5 Fig 7 1 A 2 8 5 7...
Page 248: ...248 WILO SE 02 2019 DIN A5 7 1 VDE Wilo...
Page 249: ...Wilo Actun OPTI QS 249 Fig 5 7 2 7 2 1 6 5 7 3 7 3 1...
Page 250: ...250 WILO SE 02 2019 DIN A5 7 3 2 6 5 7 3 3 7 4 5 2 5 T...
Page 251: ...Wilo Actun OPTI QS 251 8 8 1 3 C 5 8 2 40 C...
Page 252: ...252 WILO SE 02 2019 DIN A5 8 2 1 8 2 2 8 3 8 4 8 4 1 75 439 5a 5b AbfG 1 VwVwS 1999 DIN 52 900...
Page 253: ...Wilo Actun OPTI QS 253 8 4 2 TA 524 02 91 689 8 4 3 www wilo recycling com 9 Wilo 10...
Page 254: ...254 WILO SE 02 2019 DIN A5 10 1 10 1 1 1 2 3 10 1 2 1 2 3...
Page 255: ...Wilo Actun OPTI QS 255 10 1 3 1 2 3 4 5 6 10 1 4 1 2 3 4 5 6 10 1 5...
Page 256: ...256 WILO SE 02 2019 DIN A5 11 11 1...
Page 290: ...290 WILO SE 02 2019 DIN A5 1 1 1 1 2 1 3 1 4 www wilo com legal...
Page 291: ...Wilo Actun OPTI QS 291 2 2 1...
Page 292: ...292 WILO SE 02 2019 DIN A5...
Page 293: ...Wilo Actun OPTI QS 293 2 2...
Page 294: ...294 WILO SE 02 2019 DIN A5 2 3 2 4 RCD...
Page 295: ...Wilo Actun OPTI QS 295 RCD 2 5 2 6...
Page 296: ...296 WILO SE 02 2019 DIN A5 2 7 16 18 3 DIN EN 62638 Wilo...
Page 297: ...Wilo Actun OPTI QS 297 3 1 TrinkwV ACS 3 2...
Page 300: ...300 WILO SE 02 2019 DIN A5 Wilo QS Stop Module 4 3 4 4 S1...
Page 303: ...Wilo Actun OPTI QS 303 5 2...
Page 304: ...304 WILO SE 02 2019 DIN A5 5 3 1 Wilo Actun OPTI QS 20 C 50 C 5 25 C...
Page 305: ...Wilo Actun OPTI QS 305 6 5 4 6...
Page 306: ...306 WILO SE 02 2019 DIN A5 6 1 6 2 Fig 2 Fig 2 1 Actun OPTI QS 5 2 6 3 7 QS Stop Module 4...
Page 308: ...308 WILO SE 02 2019 DIN A5 6 3 RCD 6 3 1...
Page 310: ...310 WILO SE 02 2019 DIN A5 5 6 7 8 10 9 10 11 12 3 16 C 3 500 100...
Page 311: ...Wilo Actun OPTI QS 311 6 3 2 Wilo Actun OPTI QS Fig 5 Fig 5 Wilo Actun OPTI QS 1 2 3 4 6 4...
Page 312: ...312 WILO SE 02 2019 DIN A5 6 5 1 6 4 1...
Page 313: ...Wilo Actun OPTI QS 313 Fig 6 1 7 2 2 8 3 9 4 Ls 5 Ld 6 13...
Page 314: ...314 WILO SE 02 2019 DIN A5 14 15 16 17 18 19 20 21 22 23 24 25 10...
Page 315: ...Wilo Actun OPTI QS 315 3 6 4 2...
Page 316: ...316 WILO SE 02 2019 DIN A5 1 2 3 4 5 6 6 5 Fig 7 1 A 2 8...
Page 317: ...Wilo Actun OPTI QS 317 5 7...
Page 318: ...318 WILO SE 02 2019 DIN A5 7 1 VDE Wilo Fig 5 7 2 7 2 1 6 5...
Page 319: ...Wilo Actun OPTI QS 319 7 3 7 3 1 7 3 2 6 5 7 3 3 7 4...
Page 320: ...320 WILO SE 02 2019 DIN A5 5 2 5 8 8 1...
Page 321: ...Wilo Actun OPTI QS 321 3 C 5 8 2 40 C 8 2 1 8 2 2...
Page 323: ...Wilo Actun OPTI QS 323 www wilo recycling com 9 Wilo 10 10 1 10 1 1 1 2...
Page 324: ...324 WILO SE 02 2019 DIN A5 3 10 1 2 1 2 3 10 1 3 1 2 3 4 5 6...
Page 325: ...Wilo Actun OPTI QS 325 10 1 4 1 2 3 4 5 6 10 1 5 11 11 1...
Page 327: ...327 Wilo Actun OPTI QS 1 1 1 1 1 1 2 1 1 3 1 1 4 1 www wilo com legal...
Page 328: ...WILO SE 02 2019 DIN A5 328 2 2 2 1 2...
Page 329: ...329 Wilo Actun OPTI QS...
Page 330: ...WILO SE 02 2019 DIN A5 330 2 2 2 2 3 2 2 4 2...
Page 331: ...331 Wilo Actun OPTI QS RCD RCD 2 5 2 2 6 2...
Page 332: ...WILO SE 02 2019 DIN A5 332 2 7 2 16 18 3 3 DIN EN 62638 Wilo...
Page 333: ...333 Wilo Actun OPTI QS 3 1 3 KTW ACS 3 2 3 4 4 4 1 4 QSH QSI...
Page 335: ...335 Wilo Actun OPTI QS 4 1 3 4 20 4 1 4 4 4 2 4 Wilo QS Stop Module 4 3 4 4 4 4 S1...
Page 338: ...WILO SE 02 2019 DIN A5 338 5 2 5...
Page 339: ...339 Wilo Actun OPTI QS 5 3 5 Wilo Actun OPTI QS 50 20 5 25 6...
Page 340: ...WILO SE 02 2019 DIN A5 340 5 4 5 6 6 6 1 6...
Page 346: ...WILO SE 02 2019 DIN A5 346 6 5 1 6 4 1 6...
Page 348: ...WILO SE 02 2019 DIN A5 348 20 20 21 21 22 22 23 23 24 24 25 25 10 3...
Page 349: ...349 Wilo Actun OPTI QS 6 4 2 6 1 1 2 2 3 3 4 4 5 5 6 6...
Page 350: ...WILO SE 02 2019 DIN A5 350 6 5 6 Fig 7 Fi 1 A 2 8 5 7 7...
Page 351: ...351 Wilo Actun OPTI QS 7 1 7 VDE Wilo Fig 5 7 2 7...
Page 352: ...WILO SE 02 2019 DIN A5 352 7 2 1 7 6 5 7 3 7 7 3 1 7 7 3 2 7 6 5 7 3 3 7 7 4 7...
Page 353: ...353 Wilo Actun OPTI QS 5 2 5 8 8 8 1 8 3 5...
Page 354: ...WILO SE 02 2019 DIN A5 354 8 2 8 40 8 2 1 8 8 2 2 8 8 3 8...
Page 356: ...WILO SE 02 2019 DIN A5 356 9 9 Wilo 10 1 10 1 1 10 1 1 1 1 1 2 2 3 3 10 1 2 1 1 1...
Page 358: ...WILO SE 02 2019 DIN A5 358 11 1 11 1 1...
Page 359: ......
Page 360: ......
Page 361: ......
Page 362: ......