Step 1:   Unpacking the Patient Care Unit

1.)  Remove the packaging around the unit.
2.) 

Locate wall and floor mounting templates (skid will be marked) and set aside. 

 

(DO NOT DISCARD) 

 

NOTE: Templates are not to be installed as part of the cabinet. They are only used to  

  specifiy rough-in measurements.

Step 2:  

Install the Anchors and Backing

1.) 

Select   the   location   where   the   WH-2800 is to be installed.  Using the supplied templates, 

mark all mounting and rough-in locations. 

 

Make sure that the intended anchor locations will provide adequate backing to support the 

installed patient care unit. If adequate backing does not exist, install appropriate support 

backing or relocate unit before proceeding with installation

 (backing provided by others).

 

 

  

NOTE: Lay out anchor locations for the foot valve if required.

2.)  Remove the template.
3.) 

Install appropriate floor anchors to mount the toilet Z-clip securely to the floor (hardware 

supplied by installer).

4.) 

For wall outlet toilets, install the appropriate floor anchors in the specified locations.

 

 

NOTE: If the floor concrete is lightweight or less than 4” thick, through bolting to steel  

  angles under the floor is recommended (hardware supplied by installer).

5.) 

Install adequate backing for mounting the cabinet securely to the wall.

 

 

NOTE: Adequate backing and mounting hardware by others.

Summary of Contents for WH-2800 Series

Page 1: ...8 Step 2 Install the Anchors and Backing 8 Step 3 Install the Vacuum Breaker 9 Step 4 Install the WH 2800 Cabinet 9 Step 5 Install the Toilet and Waste Connections 10 Step 6 Install the Solid Surface...

Page 2: ...WH 2800 SERIES PATIENT CARE UNITS INSTALLATION OPERATION MANUAL PAGE 2 Rev 9 2022 1 800 428 4065 TOLL FREE www willoughby ind com PAGE LEFT INTENTIONALLY BLANK...

Page 3: ...es must be flushed sufficiently to remove the small particles of debris that are inherent with new con struction projects If this debris is not removed the valving in these units will be damaged Do no...

Page 4: ...WH 2800 SERIES PATIENT CARE UNITS INSTALLATION OPERATION MANUAL PAGE 4 Rev 9 2022 1 800 428 4065 TOLL FREE www willoughby ind com PHYSICAL DIMENSIONS WH 2800 SERIES...

Page 5: ...T 1 1 8 DIALYSIS BOX DRAIN 2 1 4 DIALYSIS 20 32 2 3 1 8 11 3 4 4 1 2 1 4 1 4 NOTES LEFT HAND FIXTURE SHOWN RIGHT HAND SYMETRICALLY OPPOSITE BACK EDGE OF FLOOR TEMPLATE MUST CONTACT WALL ALIGN THE FLOO...

Page 6: ...Unit until you obtain the missing parts NOTE Before beginning installation all supply drain and waste piping for the WH 2800 Series must be completed according to specified rough ins If you have not...

Page 7: ...et or cabinet installation if necessary Supply piping to toilet faucet foot valve vacuum breaker bedpan washer AS NEEDED Waste outlet piping to toilet P trap and drain piping Silicone caulk Proper mou...

Page 8: ...e intended anchor locations will provide adequate backing to support the installed patient care unit If adequate backing does not exist install appropriate support backing or relocate unit before proc...

Page 9: ...TE Mounting hardware by others Step 3 Install the Vacuum Breaker for the WH 2800 Patient Care Unit w Bedpan Washer 1 Install the vacuum breaker supplied by others to the wall per local code NOTE The v...

Page 10: ...back is flush with the wall Clean up excess caulk around the countertop edge Step 5 Install the Toilet and Waste Connections 1 Slide toilet into position over the Z clip installed in Step 2 2 Connect...

Page 11: ...allation 1 Connect the flush valve outlet to the water closet NOTE Tighten all flush valve connections 2 Connect the flush valve water supply pipe to the flush valve 1 NPT inlet 3 Install Push Button...

Page 12: ...nless steel has a bright surface that is easy to clean and is free from oxides Therefore cleaning of stainless steel is relatively simple and easy if done on a regular basis Frequency of cleaning shou...

Page 13: ...ALE REF MAT L TITLE DESC NOTED SIZE EEF 2 PLCS TOLERANCES A Indianapolis Indiana 1 FRACTIONS EEF 0 03 0 015 1 32 Willoughby Industries Inc STANDARD BACK VIEW STANDARD STAIONARY TOILET FOR PATIENT CARE...

Page 14: ...EF 3 5 15 3 5 15 A 1 OF 1 H1490 0079 1 8 N A 2 PLCS SIZE TOILET ASSEMBLY PATIENT CARE 17 TALL SHEET REV ORIG REVISION SCALE REF MAT L PART A ANGLE PETF 1490 FM BS HC 1 6 DC TITLE DESC FRACTIONS 3 PLCS...

Page 15: ...her labor charges and does not apply to any components damaged by accident abuse improper installation or improper maintenance This warranty does not cover any installation that did not comply with na...

Reviews: