WH-2600 SERIES
PATIENT CARE UNITS
INSTALLATION & OPERATION MANUAL
PAGE
3
© Rev.
2/2017
1.800.428.4065
TOLL FREE
| www.willoughby-ind.com
When installing the Willoughby Industries’
WH-2600 Series
Patient Care Units:
Before Step 1 of the Installation Instructions, ensure that rough-ins are in the
correct location.
It is essential that the water supply lines be thoroughly ushed prior to making
nal connection
to the hot and cold water supply lines. These lines
must be ushed
suf ciently to remove the small particles of debris that are inherent with new con-
struction projects.
If this debris is not removed, the valving in these units will be damaged.
Do not
attempt to remove the aerators to ush debris out of the lavatory. The damage can
only be xed by replacing the valves. Damage to valves caused by debris will not
be covered by the manufacturer’s warranty.
INSTALLATION NOTICE!
CHECK ROUGH-IN LOCATIONS
PRIOR
TO INSTALLATION
FLUSH LINES THOROUGHLY
PRIOR
TO HOOK-UP
PRE-INSTALLATION INFORMATION
INSTALLATION NOTICE!
CHECK ROUGH-IN LOCATIONS
PRIOR
TO INSTALLATION
FLUSH LINES THOROUGHLY
PRIOR
TO HOOK-UP