![Willoughby WH-2100 Series Installation And Operation Manual Download Page 11](http://html1.mh-extra.com/html/willoughby/wh-2100-series/wh-2100-series_installation-and-operation-manual_982652011.webp)
WH-2100
SERIES
PATIENT CARE UNITS
INSTALLATION & OPERATION MANUAL
PAGE
11
© Rev.
6/2017
1.800.428.4065
TOLL FREE
| www.willoughby-ind.com
INSTALLATION INSTRUCTIONS (CONT.)
Step 7: Install Faucet and Connect Water Supply
NOTE: Please refer to faucet manufacturer’s recommended installation instructions.
Step 8: Completing Installation
1.) Connect the fl ush valve outlet to the water closet.
NOTE: Tighten all fl ush valve connections.
2.) Install the P-trap (supplied by installer) to the sink drain, and then connect the P-trap to the
drain pipe (piping supplied by installer).
3.) After all toilet, faucet, and bedpan washer connections are checked for leaks, activate several
times to purge air from the supply lines.
4.) Position Folding Toilet Cover and/or Toilet Shroud Assembly and secure to the toilet with
attachment screws.
5.) Align and secure the folding cover recess cabinet door onto the WH-2100 cabinet.
6.) Close all access doors when fi nished.