P
OSITION
I
T
R
ACK
M
OUNT
C
ONTROLLER
TP-5362301-B
3-1
July 2017
Section 3
Operation
This section describes the operation of the system. Use care to follow all precautions while
operating.
3.1 Pre-Operation Check
Before operating the system, ensure:
That all appropriate precautions from the
operator’s manual (Section 1.3) are followed.
Ensure that the following warnings are understood and followed:
Safety Instruction
– Installation!
Ensure all aspects of the installation have been carried out
correctly and are safe before attempting to operate the system.
Safety Instruction
– Operation!
Before moving the PositionIt positioner the operator must
first make sure it is safe to do so.
3.2 Switching on the System
The illuminated Power Rocker Switch (Figure 3-1) on the front panel of the Rack Mount controls
both the power for the Rack Mount Controller and also to the positioner.
Once switched on, wait for (10) seconds before attempting any control inputs. This will allow the
system to initialize fully.
Figure 3-1 Front Panel of PositionIt Rack Mount Controller
Power Rocker
Switch
Summary of Contents for Position It RACK MOUNT CONTROLLER
Page 2: ......