W01-02PRI Installation Admin Guide - English
W01-02PRI Installation Admin Guide - English
Page 2 of 11
Safety Recommendations and Location Requirements
Safety Recommendations
This equipment must be installed and maintained by service personnel. Incorrectly connecting this
equipment to a general-purpose outlet could be hazardous
When the gateway is brought from a cold to a warm environment, condensation, that might be harmful to
the device, may occur. If this is the case, wait one hour before powering it
W01/02PRI must be grounded at all times when in use
The device must be installed on a circuit equipped with a breaker so that you can easily power the unit off
if required
The device should be located at 20 cm from your monitor, computer casing or other peripheral including
speakers
Do not work on W01/02PRI, connect or disconnect its cables during periods of lightning
To reduce the risk of fire, use only No. 26 AWG or larger telecommunication line cords
Location Requirements
To avoid premature aging of W01/02PRI, insure user security and facilitate access, upgrades and maintenance,
the following instructions must be followed:
Install W01/02PRI:
on a standard 48.26 cm equipment rack
on a flat surface (desk, table, etc)
Install W01/02PRI in a well-ventilated location where it will not be exposed to high temperatures or
humidity:
Storage temperature: -20 ºC to +70 ºC
Operating temperature: 0 ºC to +40 ºC
Humidity lower than 85 % and non-condensing
Do not install the device in a location exposed to direct sunlight or near stoves or radiators. Excessive heat
could damage the internal components
The device should be positioned to be accessible for future upgrade, maintenance and troubleshooting
and where cables can be easily connected
Maintain a minimum of 25 mm clearance around the device
Keep airflow around and through the vents of the unit clear of any obstruction
W01/02PRI Overview
Front panel
LEDs