background image

Your Curtis ADS System is Factory Pre‑Set for Optimum Performance.

After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller. 

The control displays   

    . Press ON/OFF button and the screen will display   

   . After three seconds,  

           is displayed. 

Water will fill the tank (approximately 2-3 minutes depending on water flow rate). When the proper level is reached 

              will appear on the screen. 

It takes approximately 20 minutes to reach setpoint temperature of 200°F.

Control will display   

   when temperature reaches the setpoint (200°F); unit is at brewing temperature.

THERMOPRO

WILBUR CURTIS

WILBUR CURTIS

WILBUR CURTIS

FILLING . . .

WILBUR CURTIS

HEATING . . .

WILBUR CURTIS

READY TO BREW

2

BREWING INSTRUCTIONS

1.  Brewer should be ON (Confirm at rear toggle switch, then press the ON/OFF button). Screen should read Ready-to-Brew. If connected to an 

InterLock grinder. Grinder should be on. 

2.  Place an empty ThermoPro server centered beneath the brewcone.

6.  Select and press desired 

brew button. Brewing will 

begin immediately.

5.  Transfer filled brewcone 

to the brew rails.

3.  Place a clean filter into 

the brewcone.

4.   Fill brewcone with the 

proper amount of ground 

coffee. If Interlocked, 

fill the brewcone at the 

grinder.

WARNING

 TO AVOID SCALDING, Do not remove brewcone while brew light is flashing.

Summary of Contents for ThermoPro Single

Page 1: ...ernational requires the following water connection 1 A quick disconnect or additional coiled tubing at least 2x the depth of the unit so that the machine can be moved for cleaning underneath the unit...

Page 2: ...eaches the setpoint 200 F unit is at brewing temperature THERMOPRO WILBUR CURTIS WILBUR CURTIS WILBUR CURTIS FILLING WILBUR CURTIS HEATING WILBUR CURTIS READY TO BREW 2 BREWING INSTRUCTIONS 1 Brewer s...

Page 3: ...ramming selections are performed with the three center buttons The symbols below the buttons are Scroll LEFT SELECTION or ENTER to save new parameter Scroll RIGHT IMPORTANT NOTE ThermoPro Programming...

Page 4: ...E 27 A 25 26 1 2 34 3 4 5 6 7 8 13 14 15 16 9 10 11 12 17 18 19 20 21 22 23 24 28 29 30 31 B 33 4 PARTS DIAGRAM THERMOPRO TWIN BREWER TP2T...

Page 5: ...NTER WRAP TP 90 VALVE WATER INLET 2GPM 120V 10W ELBOW 3 8 FL x 3 8 NPT PLATED KIT DUMP VALVE BREW RIGHT SOLENOID LOCK BREW CONE RIGHT LEFT 120V SOLENOID LOCK BREWCONE LEFT OLDER UNITS FAUCET ASSEMBLY...

Page 6: ...6 PARTS DIAGRAM THERMOPRO SINGLE BREWER TP2S 26 3 12 2 6 28...

Page 7: ...W COVER CENTER WRAP VALVE WATER INLET 2GPM 120V 10W FUSE HOLDER W 5A FUSE KIT DUMP VALVE BREW RIGHT KIT DUMP VALVE WC 820WC 821 WC 844 FAUCET ASSY HOT WATER TP2S 2T RELAY SOLID STATE 40A W HEAT SINK H...

Page 8: ...8...

Page 9: ...9...

Page 10: ...an water removing any residual detergent d Dry the area c Attach the sprayhead Cleaning the Thermoserver 1 Drain coffee from the server 2 Fill the liner with a mild detergent solution and let it stand...

Page 11: ...Page Intentionally Left Blank 11...

Page 12: ...l and plumbing codes 3 Improper voltage Equipment must be installed at the voltage stated on the serial plate supplied with this equipment 4 Improper water supply This includes but is not limited to e...

Reviews: