24
WIKA operating instructions process transmitter, model UPT-2x
14068347.01 06/2014 GB/D
GB
6 Commissioning, operation
4. Attach the push-on cap or display and operating unit and screw the case head cover
tight down to the stop.
- Ensure that the case head is tightly closed.
5. Perform a mounting correction.
- Without display, see chapter 8.1 “Performing a mounting correction (offset)”
- Via HART
®
, see chapter 8.2 “Configuring the HART
interface”
- With display, see chapter 9.5 “Mounting correction (offset)”
6.2.3 Pin assignments
Angular connector DIN 175301-803 A
1
2
3
+
1
–
2
Shield
GND
Circular connector M12 x 1 (4-pin)
4
3
1
2
+
1
–
3
Shield
4
With shielded connection cable, connect the cable shield to the internal
grounding screw.
Pin assignment
Outlet for connection cable
Cable gland
Negative power supply terminal
–
Process connection
Ground screw, inside (GND)
Positive power supply te
Spring-loaded terminal