EN
5. Commissioning, operation
14506034.01 03/2022 EN/DE/FR/ES
WIKA operating instructions model TC59-T (TEFRACTO-PAD
®
)
12
5.7 Tube clip welding
■
Attach clips at predetermined locations. Preheat area before welding if required.
Weld tube clip ends only and ensure there is a loose fit (no friction) between the
MI cable and the clip (see figure 2).
■
The tube clip should allow axial expansion of the MI cable.
■
Weld clips maximum every 300 mm [12 in] to 450 mm [18 in] of run.
5.8 Expansion loops
Expansion loops should be designed to account for maximum tube movement from start up
position to operating temperature. Loops should be designed in accordance with allowable
space available. Examples of expansion loops are S-loop, multiple coil, single coil and spiral
loop.
MI cable
Fillet
weld
Figure 2: Tube clip welding
Fillet
weld
S-loop
Single coil
Multiple coil
Spiral loop