11
WIKA operating instructions, model F2822
ADPR1X914113.01 09/2020 EN/DE
EN
5. Commissioning, operation
5. Commissioning, operation
5.1 Precautions before commissioning
■
Tension/compression force transducers are sensitive measuring instruments and
must be handled with appropriate care.
■
Before installing the tension/compression force transducer, check whether the threa-
ded bores of the mounting position have been executed dimensionally accurately,
thus guaranteeing problem-free mechanical installation of the tension/compression
force transducer.
■
Before installation, make sure that any drilling chips have been removed from the
threaded bores.
5.2 Mounting instructions
CAUTION!
Damage to the instrument through improper installation
■
With the installation of the force transducer, the installation position and
the load direction must be considered.
■
Torsional and transverse forces must be avoided. Transverse loads
and lateral forces also include the corresponding components of the
measurands that are introduced slanted.
■
Torsional moments, eccentric loads and transverse loads or lateral
forces cause measuring errors and may permanently damage the
tension/compression force transducer.
■
The installation of the tension/compression force transducer must not
be made with any violent force.
■
During installation of the tension/compression force transducer, the
output signal (force value) must always be monitored to avoid mechani-
cal overload.
■
When subjected to loads in other devices, other than those planned
in the application, a change in the zero signal may result in permanent
damage.
■
Do not use the tension/compression force transducer as a climbing aid.