WIKA operating instructions air2guide model A2G-45
GB
10
40389228.01 09/2012 GB/D/F/E/I
Key
Function
To access the menu, press the "MENU" button for approx. 3
seconds.
To exit the menu, press the "BACK" button.
To open an individual menu point, and to accept the changes,
press the "OK" button.
These buttons enable you to scroll within the menu.
6. Commissioning, operation
Connection diagram
Output signal 0 ... 10 V
Power supply AC 24 V
Relay 1 (standard)
Relay 2 (option)
If the voltages being switched via the relays
are not in accordance with SELV, then the
power supply and signal/control cables of
the relays should be installed so that they
are separated. A separate cable entry is
available for both.
Commissioning
A prerequisite for the commissioning is a proper installation of all
electrical supply, control and measuring lines and of the pressure
connection lines.
■
Before commissioning, the leak tightness of the pressure
connection lines must be checked.
Buttons for setting the individual functions
MENU
BACK
OK
Summary of Contents for A2G-45
Page 14: ...WIKA operating instructions air2guide model A2G 45 GB 14 40389228 01 09 2012 GB D F E I...
Page 26: ...D WIKA Betriebsanleitung air2guide Typ A2G 45 26 40389228 01 09 2012 GB D F E I...
Page 38: ...F Mode d emploi WIKA air2guide type A2G 45 38 40389228 01 09 2012 GB D F E I...
Page 50: ...WIKA manual de instrucciones air2guide modelo A2G 45 50 E 40389228 01 09 2012 GB D F E I...