Wicksteed YOUNG EXPLORER COOK Instructions Manual Download Page 10

PAGE     OF  

5

13

Parts List

DESCRIPTION

PART NUMBER

QTY

ITEM

LUG PLATE GENERIC

FRMT01017

4

1

50 X 50 X 90 DEG ANGLE BRACKET

SSB505090

2

2

300MM FLAT GROUND LUG

LUG300F

2

3

M8 X 100 WASHER HEAD SCREW

M8X100WHS

4

4

M10 x 70 Socket Button Head SS

M10X70BHSS

8

5

M10 X 70 COACH BOLT

M10X70CB

2

6

M10 x 100 Hex Coach

M10X100CS

4

7

M10 PLAIN WASHER

M10SWASH

22

8

M10 Nyloc Thin Nut MS ZP

M10NYLOCT

10

9

M10 DONUT (YELLOW)

M10DONUT

14

10

B

C

D

E

LOG RAMP INSTALLATION

As detailed below, secure the ramp assembly to the front of the two upright posts up against the deck using the supplied fixings as illustrated. Secure the 
ground lug to the bottom half of the ramp and rest in the foundation holes.

2

5

5

8

9

10

8

9

10

4

3

6

8

9

10

As detailed in view C position and secure the Lug Plate 'item 7' to the barrier and to the upright posts using the supplied fixings (use the reference 
dimensions on the next page to establish the correct height). As illustrated in detail view D & E, secure the Lug Plates either side of the smaller
upright posts and to the lower part of the ramp utilising the pre-drilled holes.

DETAIL B

DETAIL C

1

7

8

10

DETAIL D (use BOM on page 1)

16

18

19

20

DETAIL E

1

5

8

9

10

Summary of Contents for YOUNG EXPLORER COOK

Page 1: ...ST PART INSTALLATION DETAILS 1 READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT 2 EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT 3 ENSURE TO C...

Page 2: ...PAGE OF 2 5 CLIMBING WALL FIREMANS POLE ROPE CLIMBER POLY SLIDE LOG RAMP POLY SLIDE LOG BRIDGE FIREMANS POLE CLIMBING WALL...

Page 3: ...1 5 430 0 2115 0 1140 0 FOUNDATIONS 400 X 400 X 475 DEEP 75MM HARD STANDING UNLESS OTHERWISE SPECIFIED 95 0 95 0 570 0 570 0 95 0 952 0 1025 0 570 0 570 0 2190 0 2190 0 2190 0 2190 0 FOUNDATION 300 X...

Page 4: ...5 140 0 1143 4 2138 2 829 9 1185 2 535 6 454 9 1781 2 1120 1 381 4 1288 5 2135 2 1288 5 1288 5 1519 1 3123 1 1896 7 477 5 1022 9 873 8 748 9 75 2 798 6 1284 1 964 6 1039 8 728 1 1800 3 1040 0 SCALE 1...

Page 5: ...PAGE OF 5 5 GRASS SAVER LAYOUT 50 GRASS SAVER TILES 1 5M X 1 0M SCALE 1 55 A4 8500 0 9500 0 1185 0 2213 6 2213 0...

Page 6: ...B00839 COOK TIMBER SET 2 2 FRWK00838 COOK DECK 3 1 FRWK00840 TOWER ROOF 4 1 FRWK00841 COOK LINK BRIDGE 5 1 FRWK00842 DOUBLE DECK 6 1 FRWK00843 LOG RAMP 7 2 FRWK00844 COOK 1500 SLIDE 8 2 FRMT00845 COOK...

Page 7: ...8 4 M10 Nyloc Thin Nut MS ZP M10NYLOCT 4 5 M10 DONUT YELLOW M10DONUT 8 6 SECURING GROUND ANCHOR 2 1 3 4 5 6 Utilising the pre drilled holes on the end of each upright post secure the ground anchor to...

Page 8: ...YELLOW M10DONUT 8 3 A TOWER DECK INSTALLATION Position the tower upright posts into the foundation holes Position the deck assemblies between the posts and at the heights illustrated below Using the s...

Page 9: ...0SWASH 16 3 M10 DONUT GREEN M10DONUT_GREEN 16 4 FIXED BRIDGE INSTALLATION Position the fixed bridge assembly between the two tower decks so the bearers are on the insides of the upright posts Using th...

Page 10: ...p assembly to the front of the two upright posts up against the deck using the supplied fixings as illustrated Secure the ground lug to the bottom half of the ramp and rest in the foundation holes 2 5...

Page 11: ...ug Plates using the D shackle attached to the end of the rope as illustrated in Detail View F Ensure a sellock pin is fitted to secure the D shackle INSTALLATION AND REFERENCE HEIGHTS LOG RAMP INSTALL...

Page 12: ...INSTALLATION Position the climbing wall assembly up against the upright posts and up against the deck Secure to the posts using the supplied M8 X 100 Washer Head Screws 6 x top part of panel M6 X 100...

Page 13: ...10X60HX 2 9 M10 PLAIN WASHER M10SWASH 11 10 M10 Nyloc Thin Nut MS ZP M10NYLOCT 2 11 M10 DONUT YELLOW M10DONUT 9 12 G H POLY SLIDE INSTALLATION Position the slide panel assembly up against the upright...

Page 14: ...IDOME300C 2 3 J BUBBLE INFILL INSTALLATION As illustrated below position the infill panel in between the two upright posts and resting on the deck Secure in place to the upright posts and to the deck...

Page 15: ...mensions below position the Firemans Pole steelwork on the insides of the upright posts With the unit in place secure to the upright posts using the supplied fixings as shown in detail view K INSTALLA...

Page 16: ...Nut MS ZP M10NYLOCT 10 9 M10 DONUT GREEN M10DONUT_GREEN 20 10 L M PULL UP RAMP INSTALLATION As detailed below secure the ramp assembly to the front of the two upright posts up against the deck using t...

Page 17: ...tes Item 7 to the guard rail and the lower part of the ramp assembly to the dimensions shown below As shown in Detail N use the provided Button Head Screws to centrally secure the Lugs DETAIL N 1 5 8...

Page 18: ...ONUT GREEN M10DONUT 4 3 ROOF INSTALLATION Position the roof onto the top of the vertical posts so the underside of the roof is touching As illustrated in detail view P secure the roof assembly to the...

Reviews: