background image

2

C80 FF and C95 FF - 

User's

Safety

It is essential that the instructions in this booklet are strictly
followed, for safe and economical operation of the boiler.

Current Gas Safety (Installation and Use)
Regulations or rules in force.

 In your own interest, and that of safety, it is the law that this
boiler must be installed by a CORGI registered installer, in
accordance with the above regulations.

Tampering with sealed components or incorrect use of the
boiler will invalidate the boiler guarantee.

Electricity Supply

This appliance must be connected to the supply via a double-
pole switch, fused at 3 A.

C80 FF .........................

G.C. Appliance No. 47 348 05

C95 FF .........................

G.C. Appliance No. 47 348 06

Natural Gas Models Only

Minimum Clearances

The minimum clearances given below must be complied
with in order to maintain the safe running of the boiler and
to facilitate servicing.

Above the boiler -

160 mm (6 

1/4

")

At LH side of the boiler -

15 mm

(

5/8

")

At RH side of the boiler -

35 mm (1

 3/8

")

Underneath the boiler casing:

for service -

150 mm

(6")

Front of the boiler:

for service -

450 mm

(18")

CAUTION. 

 

To avoid the possibility of injury during the installation, servicing or cleaning of

this appliance care should be taken when handling edges of sheet steel components.

THE LOG BOOK SHOULD BE COMPLETED AFTER

EACH SERVICE AND KEPT WITH THESE

INSTRUCTIONS

All CORGI registered installers carry a CORGI ID card, and have a registration number.  Both should be recorded in your 

Benchmark

Log Book.  You can check your installer by calling CORGI direct on 0156 372 300.

Reviews: