![Whittier Wood 5600RGB Assembly Instructions Manual Download Page 11](http://html1.mh-extra.com/html/whittier-wood/5600rgb/5600rgb_assembly-instructions-manual_977845011.webp)
5600RGB Stonewood Queen Manor Upholstered Storage Bed;
5609RGB Stonewood King Manor Upholstered Storage Bed;
5627RGBc Stonewood Queen Manor Upholstered Bed;
5635RGBc Stonewood King Manor Upholstered Bed
Assembly Instructions
This assembly requires two people.
5600RGB_5609RGB_5627RGBc_5635RGBc
Page 11
— 08/18
7.
Open the drawers. Face the Footboard and stand in between the first and second braces.
Place a Queen Trestle with T-Nuts (I) or King Trestles with T-Nuts (J) on the outside surfaces of
the first upper left and right braces so that the T-Nuts (Y) sit near the top. See Figure 6a. Line up
the upper edges of the trestle and braces so they are nearly flush. Insert two 1/4" x 1-1/2" Hex
Bolts (ZA) and Washers (ZT) and tighten. Repeat for the second upper brace.
See Figures 7 and 7a.
Fig. 7
I or J
First brace
Second brace
Footboard
Headboard removed for illustration purposes.
Fig. 7a
ZT
Brace
ZA
ZT
x 4
x 4
ZA
I or J