background image

1452AFGSPb; 1452AFCAFb Pacific King Storage Bed 

Assembly Instructions 

This assembly requires two people. 

1452AFGSPb_1452AFCAFb 

— Page 7 — 12/13 

 
7. 

Position the Headboard (A) against the end of the pedestal assembly. Place four 5/16" Washers 
(E) over four 5/16" x 2-1/4" Hex Bolts (D) and thread the washer/bolts through the predrilled 
holes in the Pedestal Assembly and into the Headboard. Tighten the bolts with a 1/2" wrench. 
See Figure 7. 
 

 

8. 

Secure the pre-attached Angle Brackets (K) on the Headboard to the Pedestal Assembly with 
six #6 x 3/4" Flat Head Screws (L). See Figures 8 and 8a. Insert one Barrel Nut (I) into the pre-
drilled holes on the bottom of the left pedestal rail. Using a slotted screwdriver, line up the hole 
in the Barrel Nut to the hole in the Headboard. Insert one 1/4" x 80mm Hex Bolt (F) into the pre-
drilled hole in the Headboard and tighten with the provided Hex Wrench (S). Repeat for the right 
side. See Figures 8 and 8b.  
 

 

Fig. 8 

x 2 

x 2  

x 6  

Fig. 8b 

Fig. 7 

x 4 

x 4  

Summary of Contents for 1452AFGSPb

Page 1: ...stances including wood dust is present even in trace amounts Drilling sawing sanding or machining wood products generates wood dust a substance known to the State of California to cause cancer Warning...

Page 2: ...rd Kit x1 Part Description Quantity A Headboard Assembly 1 B Footboard Assembly 1 D 5 16 x 2 1 4 Hex Bolt 8 E 5 16 Flat Washer 8 F 1 4 x 80mm Hex Bolt 2 G 1 4 x 1 3 4 Hex Bolt 12 H 1 4 Flat Washer 12...

Page 3: ...Box inserted 3 P Drawer Face attached 3 R Drawer Slides pre installed sets 3 T T Nut inserted 9 X 7 x 1 1 2 Black Pan Head Screw inserted 79 ZA 6 x 1 1 4 Black Pan Head Screw inserted 12 ZB 8 x 20mm P...

Page 4: ...correct re installation Positions are marked on the drawer bottoms 2 To protect your flooring and the surface of the unit place the Pedestal Kits N face down on top of opened and unfolded 1453 cartons...

Page 5: ...es with Hex Nut ZF so that the Assembled Feet ZG are 4 1 2 tall as shown in Figure 3a Attach the six Assembled Feet ZG as shown in Figure 3 4 This step requires two people to move the bed to its uprig...

Page 6: ...any excess glue See Figures 5 and 5a 6 Position the Footboard B against the end of the pedestal assembly and insert the dowels J into the oval holes in the top cap of the footboard Place four 5 16 Wa...

Page 7: ...ts with a 1 2 wrench See Figure 7 8 Secure the pre attached Angle Brackets K on the Headboard to the Pedestal Assembly with six 6 x 3 4 Flat Head Screws L See Figures 8 and 8a Insert one Barrel Nut I...

Page 8: ...bed into its final position verify that all 6 Assembled Feet ZG are touching the floor and carrying weight if needed use a 1 2 wrench to adjust the Adjustable Glides ZF on the bottoms of the Assembled...

Reviews: