AUTOMATIC TESTING
Commissioning Test
A full commissioning test is carried out automatically after permanent connection of the supply. The easy
commissioning feature will set the initial test day and time to ensure random testing of units.
Functional Test
Functional tests are carried out for 30 seconds on a weekly basis.
Duration Test
A full duration test is carried out yearly to check the capacity of the batteries.
STATUS INDICATION
(Standard LED configurations)
Single Bi-colour LED
STATUS
Two separate LED’s
GREEN
RED
GREEN
AMBER
ON
System OK
ON
OFF
FLASHING
Functional test underway
ON
OFF
ON
Lamp fault
ON
FLASHING
SLOW
FLASH
Battery fault
OFF
FLASHING
FAST FLASH
Charging fault
OFF
FLASHING
NOTE : IEC 60073 recommends that the charge indicator LED should be Green to indicate System OK.
The above table conforms to those recommendations.
It is possible to reverse the bi-colour LED connections to swap Green and Red indications and it is also
possible to have an alternative Red + Amber LED pair for compatibility with earlier product.