AUTOMATIC TESTING 

 

Commissioning Test  

A full commissioning test is carried out automatically after permanent connection of the supply. The easy 
commissioning feature will set the initial test day and time to ensure random testing of units. 

Functional Test 

Functional tests are carried out for 30 seconds on a weekly basis. 

Duration Test 

A full duration test is carried out yearly to check the capacity of the batteries. 

 

STATUS INDICATION 

(Standard LED configurations) 

Single Bi-colour LED 

STATUS  

Two separate LED’s 

GREEN 

RED 

 

GREEN 

AMBER 

ON 

 

System OK 

ON 

OFF 

FLASHING 

 

Functional test underway 

ON 

OFF 

 

ON 

Lamp fault 

ON 

FLASHING 

 

SLOW 

FLASH 

Battery fault 

OFF 

FLASHING 

 

FAST FLASH 

Charging fault 

OFF 

FLASHING 

  

NOTE : IEC 60073 recommends that the charge indicator LED should be Green to indicate System OK. 
The above table conforms to those recommendations. 

 

It is possible to reverse the bi-colour LED connections to swap Green and Red indications and it is also 
possible to have an alternative Red + Amber LED pair for compatibility with earlier product. 

 