8
2.
Screw in leveling legs
Install Leveling Legs
To avoid damaging floor, use a large flat piece of cardboard
from dryer carton; place under entire back edge of dryer.
Firmly grasp dryer body (not console panel) and gently lay
dryer down on cardboard.
NOTE:
Residual water from factory testing may drain when
dryer is laying on its side.
1.
Prepare dryer for leveling legs
Using a wrench and tape measure, screw leveling legs into
leg holes until bottom of foot is approximately 1/2" (13 mm)
from bottom of dryer.
Now stand the dryer on its feet. Slide the dryer until it is
close to its final location.
Electric Installation - U.S.A. Only
Remove hold-down screw and terminal block cover.
1.
Choose electrical connection type
Power supply cord 4-wire receptacle
(NEMA Type 14-30R).
Go to “Power Supply Cord Connection.”
3-wire direct connection:
Go to “Direct Wire Connection.”
4-wire direct connection:
Go to “Direct Wire Connection.”
Power supply cord 3-wire receptacle
(NEMA Type 10-30R).
Go to “Power Supply Cord Connection.”
NOTE:
If local codes do not permit connection of a
cabinet-ground conductor to neutral wire, go to “Optional
External Ground 3-wire connection.” This connection
may be used with either a power supply cord or a direct
wire connection.
2.
Remove terminal block cover
Before you start: disconnect power.