7
INSTALLATION INSTRUCTIONS
NOTES:
■
Depending on your model, determine which venting
method to use: roof, wall, or non-vented (recirculating).
■
It is recommended that the vent system be installed before
the range hood is installed. Go to “Venting System” in the
“Installation Requirements” section if you need assistance.
■
Before making cutouts, make sure there is proper clearance
within the ceiling or wall for the vent system.
1.
Disconnect power
2.
Mark Hole Locations
Align the exterior edge of the mounting brackets with the
exterior edges of the upper cabinet.
IMPORTANT:
The brackets should touch the upper cabinet.
With a pencil, mark the upper holes on the brackets.
3.
Install Brackets
■
Using a #2 Phillips screwdriver, install the drywall anchors.
■
Using #8-18 x 1" (4.2 x 25 mm) flat-head #2 Phillips screws,
install the mounting brackets using the upper holes.
NOTE:
For installations to a surface other than drywall, it is
recommended that a qualified contractor determine the
anchoring method.
4.
Prepare Range Hood
■
Set the range hood on its back on a covered surface.
■
Remove the filter, locking screw, and side panels.
■
Remove the rectangular damper.
■
Using a #2 Phillips screwdriver, remove the electrical
box cover.
■
Using a flat-blade screwdriver, remove the appropriate
power supply knockout.
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.