
6
ProPress SP
Furnace Operations Manual
Quick-Cool Jet Installation
Preparation:
1. Remove the vacuum pump from its box.
2. Remove the brass hose barb from the Furnace
accessory box.
3. Remove the muffler from the output end of the
vacuum pump. (The input and output valves are
identified by arrow indicators on the vacuum pump
near inlet or outlet.)
4. Install the brass barb to output end of the vacuum
pump. (Where the muffler used to be.)
5. There should be two hoses included. One in the
accessory box, the other inside the vacuum pump
box. Use the hose included in the accessory box for
the Quick-Cool Air Jet.
Installation:
1. Push one end of the clear hose included in the
accessory box over the output barb fitting at the
output end of the vacuum pump.
2. Place the other end over the silver Quick-Cool Jet
barb located on the upper right back of the furnace.
(See below.)
3. Using the other pink hose, place one end over the
input side barb of the vacuum pump.
4. Place the other end over the vacuum barb at the back
of the furnace.
5. Plug the power cord into the power outlet at the back
of the furnace next to the furnace power inlet.
Using the Quick-Cool Jet:
The Quick-Cool Jet will activate when a program has been
started with a lower entry temperature than the furnace's
current temperature.
1. To enable the Quick-Cool Jet, select and run a
program with an entry temperature lower than the
current temperature.
2. Once a program is complete, start the next program
and the Quick-Cool Jet will engage.
Main Power Inlet
Quick-Cool
Jet Barb
This side goes to the
Quick Cool Jet
Vacuum
Hose Barb
Vacuum Pump
Power Outlet
Output Barb
goes here
Input
Barb