- FRAME LINEA VANITY INSTALL GUIDE -
(2018-05-07)
2/8
WARNING!
To reduce the risk of fire, electric shock, or injury to persons, please read these instructions
thoroughly before using this product.
Important Safety Instructions must be kept for future use.
TOOLS AND EQUIPMENT
• Drill and bits
• Measuring tape
• Protective paper
• Pencil
• Level
•
Protective eyeglasses
•
Wood screw #8, 5/8" and 1-½" long
•
Wood screw #10, 3" and 4" long
IMPORTANT
This installation might require custom placement of studs relative to the position of the
product in the room. Please read the instructions related to your Vanity model carefully.
Wall Preparation Steps
1.1
Make sure that walls and floor are straight and level.
1.2
Determine overall Vanity dimensions.
1.3
Determine the desired location of the Vanity.
1.4
The distance between studs should not be more than 16".
1.5
Metal studs should be reinforced vertically by 2" x 4" wooden studs. This is
applicable for both Linea Vanities.
1.6
Metal and wooden studs should be reinforced horizontally with 2" x 6" wooden
studs at anchoring heights:
• 23 3/8" along the full width of the vanity
1.7
Do not apply the product to the wall surface until all braces and mounting clips
have been installed and all plumbing and electrical rough-ins have been
completed.
* See diagram on page 3
Center Line Anchoring Heights:
Vanity: 32” from floor
Z-clip height: 28”
Z-clip anchor height: 25-1/4”
(Stud center line)
25-1/4”
Anchor height
(Stud center line)