- W2 ELEMENT INSTALL GUIDE -
(2015-09-17)
3/12
WALL PREPARATION
The ELEMENT collection is designed to be wall-mounted and needs special wall preparation
for the vanity and for the mirrored and linen cabinets.
1.
Make sure that walls and floor are straight and level.
2.
Determine the desired location of the cabinet.
3.
The distance between studs should not be more than 16".
See diagram #1
4.
Metal studs should be reinforced vertically by 2" x 4" wooden studs. This is applicable
for all furniture.
5.
Metal and wooden studs should be reinforced horizontally with 2" x 6" wooden studs
at anchoring heights 29’’:
29" along the full width of the vanity
58’’ & 73-3/4" along the full width of the mirror cabinet
13-3/4 & 63" along the full width of the linen cabinet
6.
Do not apply the product to the wall surface until all braces and mounting clips have
been installed and all plumbing and electrical rough ins have been completed.
PLUMBING
The pipes should be positioned at a height of 21’’.
The pipes are located inside the furniture.
Anchoring HEIGHTS
Vanity: 29’’
Mirror Cabinet: 58’’ & 73-3/4’’
Linen Cabinet: 13-3/4’’ & 63’’
Horizontal wooden studs heights
(Measured from floor to top of the
stud)
Vanity: 31’’
Mirror Cabinet: 60’’ & 75-3/4’’
Linen Cabinet: 15-3/4’’ & 65’’