13
WHL-016 REV. 12.18.14
Figure 1
– Required Clearances
Space must be provided with combustion/ventilation air openings correctly sized for all other boilers located in the same space as the
boiler. The boiler cover must be securely fastened to prevent it from drawing air from the mechanical room. This is particularly important
if the boiler is in a room with other boilers. Failure to comply with the above warnings could result in substantial property damage,
severe personal injury, or death.
Always take future maintenance into consideration when locating the boiler. If the boiler is located in an installation location with limited
clearances, it may be necessary to remove the boiler from the space to perform maintenance. Failure to consider maintenance when
determining installation location could result in property damage.
MINIMUM CLEARANCES FROM COMBUSTIBLE MATERIALS
Hot water pipes
– at least 1” from combustible materials.
Exhaust vent pipe
– at least 1” from combustible materials.
Summary of Contents for WBCNG399W
Page 14: ...14 WHL 016 REV 12 18 14 SPECIFICATIONS AND DIMENSIONS Figure 2 Specifications and Dimensions ...
Page 24: ...24 WHL 016 REV 12 18 14 Figure 8 Piping Symbol Legend ...
Page 59: ...59 WHL 016 REV 12 18 14 Figure 32 Cascade Master and Follower Wiring ...
Page 60: ...60 WHL 016 REV 12 18 14 Figure 33 Internal Connection Diagram LP 293 J ...
Page 83: ...83 WHL 016 REV 12 18 14 055 080 110 PARTS BREAKDOWN Figure 36 Replacement Parts LP 387 J ...
Page 85: ...85 WHL 016 REV 12 18 14 155 199 285 399 PARTS BREAKDOWN ...
Page 86: ...86 WHL 016 REV 12 18 14 Figure 38 Replacement Parts LP 387 KK ...
Page 87: ...87 WHL 016 REV 12 18 14 155 199 285 399 MODEL PARTS BREAKDOWN ...
Page 91: ...91 WHL 016 REV 12 18 14 ...
Page 92: ...92 WHL 016 REV 12 18 14 ...