FOR
2
POLE BREAKER
OMIT MIDDLE POLE
FOR
4
POLE BREAKER
COVER PLATE
BREAKER UNIT
FIG. 7.
Panel Frame Mounting Assembly
Check to see that main copper connections are
tight and taped according to standard practice.
Check to see that tank is filled to proper level
with oil that has been checked to be up to standard.
New oil should check 22 kv or better in standard
test cup. Be sure dash pot of time delay trip is
filled with the special oil provided.
9
www
. ElectricalPartManuals
. com