Westgate DV62 Installation Manual Download Page 1

Log Set Installation

DV62

S H E R W O O D   I N D U S T R I E S   L T D

SHERWOOD INDUSTRIES IS AN ENVIRONMENTALLY RESPONSIBLE COMPANY. THIS MANUAL IS PRINTED ON RECYCLED PAPER.

PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE

This publication is intended as a 

guide for installers to help with the 

assembly of the log set only.  
Please refer to the Westgate DV62 

Owner’s Manual for specific, detailed 

and complete information on 

installation and operation.

Summary of Contents for DV62

Page 1: ...MPANY THIS MANUAL IS PRINTED ON RECYCLED PAPER PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE This publication is intended as a guide for installers to help with the assembly of the log set only Please refer to the Westgate DV62 Owner s Manual for specific detailed and complete information on installation and operation ...

Page 2: ...d of log 8 onto the grate Insert the pin hole on the front end of log 8 into the pin tab at the center of the grate Each log is numbered 1 through 10 to assist in the log set assembly Logs are not assembled in sequence 2 9 4 10 7 5 8 6 3 1 8 8 Locating Hole Groove Grate Pin Tab ...

Page 3: ...ocating Groove Fits Here Log Rests Here Ridge Lean the front end of Log 7 up against the ridge on Log 8 8 Locating Hole Pin Tab 3 Install Log 9 Place the locating hole on the left side of log 9 onto the locating pin on the grate Place the right side of Log 9 onto the flat surface on the rear of Log 7 7 Log 9 in position ...

Page 4: ...n position The bottom of Log 9 should be parallel to the top of the riser 4 Install Log 5 Fit the 2 locating grooves on Log 5 onto the 2 tabs on the left side of the grate Groove 1 Tab 1 Groove 2 Log 5 in position Tab 2 ...

Page 5: ...6 6 6 6 6 5 Install Log 6 Fit the 2 locating grooves on Log 5 onto the 2 tabs on the right side of the grate Groove 1 Tab 1 Groove 2 Tab 2 Log 6 in position ...

Page 6: ...he rear of Log 10 onto the groove at the rear of Log 8 Place the front of Log 10 onto the notch in Log 7 7 Groove 8 7 Install Log 2 Place the bottom of Log 2 onto the grate Log 2 in position Groove Grate Rest the top of Log 2 onto Log 9 9 ...

Page 7: ...n the bottom of Log 1 onto the grate 4 4 9 Install Log 4 Place the groove on the bottom of Log 4 onto the grate Groove Grate Place the top of Log 4 into the groove of Log 10 1 1 Rest the top of Log 1 onto Log 9 Groove Grate 10 Groove 9 ...

Page 8: ...3 4 3 Log 4 in position 10 Install Log 3 Place the groove on the bottom of Log 3 onto the grate Rest the top of Log 3 onto the logs behind it Log 3 in position Grate 6 Groove ...

Page 9: ...Completed Log Set ...

Reviews: