background image

WE-7 Operating Instructions 

1

 
  

     26509 Township Road 543 

 

 

Phone: (780) 459-6720 

     Sturgeon County, Alberta 

 

 

Fax: (780) 459-7837 

T8T 1M1 

        

 

 

 

 

E-mail: [email protected]

 

Web: www.westerninstruments.com 

 

 

 

    

Operating Instructions 

 

 

 

WE-7 

Compact AC/DC Yoke

 

 

E s t a b l i s h e d

1 9 6 5

 

Summary of Contents for WE-7

Page 1: ...509 Township Road 543 Phone 780 459 6720 Sturgeon County Alberta Fax 780 459 7837 T8T 1M1 E mail info westerninstruments com Web www westerninstruments com Operating Instructions WE 7 Compact AC DC Yo...

Page 2: ...y While depressed the switch delivers power AC to the coil encapsulated in the Yoke housing Review the instructions in this guide for switch replacement 2 Slip In Switch Cover The Slip In Switch Cover...

Page 3: ...he Field Intensity is Infinitely Variable with the use of the Intensity Knob which is also located on the Control Panel An illustration of the Control Panel is show bellow DO NOT CHANGE THE FIELD WITH...

Page 4: ...operation the unit can be operated for extended periods of time however the Yoke housing may get to warm to hold If the Yoke is used for prolonged periods of time of continuous cycling such as 2 to 3...

Page 5: ...ection when Fluorescent Particles are used Indications found with Dry Powder and an AC Field will tend to form immediately and will take slightly longer with Wet Method Particles While using a DC Fiel...

Page 6: ...e Neutral Black Live Care must be taken to insure the proper installation of an AC Power Plug and if there is any question contact your distributor or Western Instruments If an AC Plug in not installe...

Page 7: ...ore we recommend instructional training to CGSB ASNT or other regulatory authority qualifications Western Instruments highly recommends the end user exercise all possible safety precautions including...

Reviews: