LEONARDO PRO II 3000/48 Li
User manual
EN
10
INVERTER WIRING
Make the electrical connections of the inverter, strictly following the following order:
1.
positive battery
cable (see connection in the section
Continuous Current Protection
);
2.
negative battery
cable
;
3. connect the
CAN communication
cable; (see
Continuous Current Side Protections
)
4. connect the
BUS control
cable from the counter P1, through a polarized connector; (
see Control BUS cable
diagram at counter P1
)
5. connect the
PLUG Data-logger
; (see
optional
Data Logger installation diagram
)
6.bring the
AC current side protections on AC-IN and EPS-OUT to OFF
(see paragraph EXTERNAL PROTECTION);
7. connect
AC-IN input
on AC Input connection via plug and play type RST AC connectors;
8. connect the
EPS OUT output of the PRIVILEGED UTILITIES
to the AC Output connection via the RST plug and
play AC connectors.
Pic.14 Inverter Wiring
CAN communication cable
Cable length 1.5 m
AC INPUT
Wiring via 3-pin plug and play
connectors - 6mm ^ 2
RESET
BUTTON
PLUG DATA-LOGGER
Black (*optional)
AC OUT EPS - PRIVILEGED
Wiring via 3-pin plug and play
connectors - 6mm ^ 2
DC Battery Input
Cable 1,5 m-Section 25 sq.
CONTROL PLUG
BUS P1
Summary of Contents for Leonardo Pro II
Page 1: ...Leonardo Pro II 3000 48 Li Manuale utente User manual IT EN...
Page 2: ......
Page 36: ......