Westell VirtualEdge VESR-00 Manual Download Page 10

Section VES-R00-20A

030-101639 Rev. B

R

10

0802IARB

routings and cable connections, to perform any equipment
testing, to perform cable management and housekeeping in
preparation for closing the SwingRack, to close the arms of
the SwingRack, and to install and lock the front cover (if
provided).

4.

CUSTOMER & TECHNICAL SERVICES

4.1

Customer Service & Technical Assistance

If technical or customer assistance is required, contact Westell
by calling or using one of the following options:

Voice: (800) 377-8766
email:

[email protected]

Visit Westell’s World Wide Web site at http://www.Westell.com
for additional information about Westell.

4.2

Part Numbers

This equipment is identified by a product number
(A90-VESR00), which consists of three parts: the issue letter
of the equipment (A), the assembly type (90), and the specific
model number (VESR00). Each time a change is made to the
product which changes the form, fit, or function of the product,
the issue letter is incremented or advanced by one. Be sure to
indicate the issue level as well as the model number when mak-
ing inquiries about the equipment.

5.

WARRANTY & REPAIRS

5.1

Warranty

Westell warrants this product to be free of defects at the time
of shipment. Westell also warrants this product to be fully func-
tional for the time period specified by the terms and conditions
governing the sale of the product. Any attempt to repair or
modify the equipment by anyone other than an authorized
Westell representative will void the warranty.

5.2

Repair and Return

Westell will repair or replace any defective Westell equipment
without cost during the warranty period if the unit is defective
for any reason other than abuse, improper use, or improper
installation. To return defective equipment, first request a Re-
turn Material Authorization (RMA) number from Westell by
calling or using one of the options shown below. Once an RMA
number is obtained, return the defective unit (freight prepaid),

along with a brief problem description, to the address we will
provide to you when you contact us.

Voice: (630) 375-4211
email: [email protected]

Replacements will be shipped in the fastest manner consistent
with the urgency of the situation. Westell will continue to repair
or replace faulty equipment beyond the warranty period for a
nominal charge. Contact Westell for details.

6.

SPECIFICATIONS

6.1

Physical Specifications

The physical specifications are shown in Table 2.

Physical Feature

U.S.

Metric

Height

24.38 inches

62 cm

Width

 (closed)

26.5 inches

67.3 cm

Depth

 (closed, including lock)

6.38 inches

16.2 cm

Depth

 (open)

18.5 inches

47 cm

Depth

 (open, with D-ring installed)

21.6 inches

55 cm

Weight 

(approx.)

24 pounds

10.9 Kilograms

Max. Load Weight

25 pounds

11.4 Kilograms

Operating Temperature

−40

°

 to 149

°

F

-40

°

 to 65

°

C

Humidity

5 to 95% (non-condensing)

For mounting hole spacings or dimensions, see Figure 6.

Table 2.    Physical Specifications

6.2

Ordering Specifications

To order units, call the telephone number shown in Paragraph
4.1

 

and please specify a part number, as shown in Table 3.

Part #

Description

A90-VESR00

VirtualEdge

t

 SwingRack 19/23" wall-mount equipment

rack. Includes a ground lug, a ground strap, 4 adapter ears,
6 internal-arm D-rings, and 2 external-arm 3" D-rings.

A90-VESR14

SVirtualEdge

t

 SwingRack 19/23" wall-mount equipment

rack, 

with additional fiber and cable management features

.

Includes a ground lug, a ground strap, 4 adapter ears, 5
internal-arm D-rings, a 2-piece fiber management spool,
two bend-radius protection boots, a cable race-way (duct),
a flexible fiber-cable protection tube, and a locking cover.

Optional Equipment*

A90-VECMRING3 Cable management D-Ring (Qty = 1)

Splice Tray Kit

A splice tray and two screws are available as a kit, mounts
inside the swing-arm.

A variety of optional equipment is available. Call Westell for details.

Table 3.    Ordering and Option Information

Summary of Contents for VirtualEdge VESR-00

Page 1: ... Unit RU high equipment in the SwingRack saves valuable rack space for other equipment makes use of previously vacant wall space and facilitates installation maintenance and testing proce dures by rotating the attached equipment down to a comfortable easy access horizontal height The key feature of the SwingRack is the matching set of 90_ rotating arms rails which imitate and duplicate the width b...

Page 2: ...nagement and protection S Spring loaded slam bolt latches one in each arm securely lock the SwingRack s arms in the up position S Holes and slots strategically placed for cable tie downs S Sturdy but light weight material steel back plate and alumi num swing arms and support plate S Ground lug accepts 6 AWG ground wire S Flexible heavy duty ground strap VESR 00 model only S Two external 3 D rings ...

Page 3: ...mmon to all models in the series 2 1 1 Construction Design and Material The one piece SwingRack takes advantage of the available and vacant wall space in crowded equipment rooms so 1 or 2 RU high equipment that typically is mounted in 19 or 23 equipment racks can be mounted on a wall leaving valuable rack space for taller equipment or additional equipment Each SwingRack model consists of a durable...

Page 4: ... posi tion if desired The rings are made of a flexible aluminum and are designed with an angled cut or slit on the outer edge to facil itate cable routing ingress and egress into and out from the internal confines of the D ring Simply press on the top or bot tom half of the D ring and route the cables through the provided gap in the D ring 2 1 4 2 Slam bolt Latch When the swing arms are in the up ...

Page 5: ...ing it off place the rear wall of the race way against the adapter ears align the holes then attach the race way to the ears with the provided hardware Route cables through the race way to the slotted hole or tab closest to the equipment s desired connec tor and press on the race way slot s flexible tab to create space to enable the cable to enter the slotted hole When all cables are connected or ...

Page 6: ...tween any multiple installations or other equipment The distance from the cable entry point should be consistent with local installation practices Figure 6 Corner Mounting Hole Locations and Dimen sions VESR XX Front View Open Position Adapter ears installed at end of open arms Self leveling center keyhole for drywall walls center between 16 studs See Table 2 for more dimensions CAUTION When using...

Page 7: ...date the mounting screws bolts or fas teners being used hardware not included at the marked locations Do not drill holes too big to ensure a snug fit 8 Partially install all screws Partially install all screws bolts or fasteners leaving approximately inch protruding from which to hang the unit via the unit s keyhole shaped holes When mounting on a wood backboard use 10 or greater steel pan head wo...

Page 8: ...U is available attach the D rings to the center set of holes in the installed adapter ears first mount the adapter ears to the swing arms then mount the D rings to the ears using the provided hardware 5 Install race way slotted duct if applicable For the VESR 14 model only if desired and if one RU is avail able the provided cable race way can be installed at this time in the top RU position for ca...

Page 9: ...the lock and turn the key clockwise to rotate the lock s tab into the slot pro vided for it in back plate s top flange 3 5 2 Mounting 19 Equipment If the equipment to be mounted on the SwingRack was de signed for 19 rack mounting first install the provided adapter ears onto the ends of each swing down arm before attaching the equipment to the arms Follow the steps below 1 Place arms in down positi...

Page 10: ...y calling or using one of the options shown below Once an RMA number is obtained return the defective unit freight prepaid along with a brief problem description to the address we will provide to you when you contact us Voice 630 375 4211 email rgmdept westell com Replacements will be shipped in the fastest manner consistent with the urgency of the situation Westell will continue to repair or repl...

Reviews: