background image

030-101704 Rev. C

R

Section VE2-848-CK6-20A

2

1006IARC

and Virtual Private Network services creates numerous ap-
plications for Westell’s VirtualEdge panels. These panels are
intended to be simple, sturdy, and versatile mechanical plat-
forms, used to terminate high-speed Ethernet, fiber, or copper
services in any combination(s). Additional interfaces can also
be installed on a per-circuit basis.

1.6

Product Features

The VE-2848C-K6 panel offers the following features.

D

1 Rack Unit (RU) high

D

28 RJ48C jacks

D

Removable LGX-type panel with 6 Keystone-type coupler
positions [accepts any combination of RJ45/48 (Cat5e for
Ethernet and DS1), SC/LC (fiber), BNC (DS3) or other
Keystone-type couplers]. Blank hole covers included.

D

Two, 32-pair, female, Amphenol connectors at rear

D

Mounts on wall or in 19" or 23" relay racks or data cabinets

D

Adjustable, reversible, mounting ears

D

Rear steel tray provides cable support and cable tie-downs
for cables coming from the Network/Telco

D

Steel construction

D

Circuit identification card with clear plastic packet

D

Rack mounting hardware included

D

Lacer or towel bar included

D

Ground lug, nut, and stud

D

Optional couplers, front cable management tray, cable
management D-rings, and combination kits available (see
Table 4)

- PRECAUTIONARY STATEMENT -

Never install telephone wiring during a lightning storm.

Never install telephone jacks in wet locations unless the jack
is specifically designed for wet locations.

Never touch uninsulated telephone wires or terminals unless
the telephone line has been disconnected at the network
interface.

Use caution when installing or modifying telephone lines.

- INSPECTION NOTE -

Visually inspect the unit for damages prior to installation. If the
equipment has been damaged in transit, immediately report the
extent of the damage to the transportation company and to West-
ell (see Part 4 for telephone number).

2

INSTALLATION

The VE-2848C-K6 panel can be mounted on a wall or in 19" or
23" relay racks with standard EIA 1.75" hole spacing. When
rack mounting, the panel can be installed so the front of it is
flush with the front of the rack, or mounted in a projected posi-
tion in the rack. The following paragraphs and Figure 3 provide
further details. Screws to attach the mounting ears to the panel
are provided, as well as screws to mount the panel to a rack.

2.1

Mounting in a 19" Rack

The panel is shipped from the factory pre-assembled. Each
panel is equipped with two, removable, L-shaped, mounting
ears (located in the bag of parts). For 19" rack mounting, the
mounting ear’s short flange attaches to the rack channel.

1.

Determine vertical position in rack. 

Select the vertical

mounting location in the rack. This panel requires one ver-
tical Rack Unit (RU) in a standard Telco relay rack.

2.

Remove ears from bag.

 Locate the bag of parts shipped

with the panel and remove the two L-shaped mounting
ears and the rack mounting hardware. Each ear flange has
several sets of mounting holes in it.

3.

Determine horizontal position (shelf projection). 

The

mounting ears and the panel’s side flanges have several
mounting holes from which to choose, for the desired
amount of projection in the rack. If a

 projected look

 or ori-

entation in the rack is desired, the ears should be attached
in the last ear hole position on the panel’s side flanges, so
that the panel will be projected further forward from the
mounting ears. If a 

flush look

 in the rack is desired, the

mounting ears should be attached in the first or forward
ear hole position on the panel’s side flanges.

4.

Attach long flange of ear to panel. 

Attach both ears to the

panel in the desired position as determined in the step
above, using the hardware provided. The ear’s long flange
abuts the panel.

5.

Attach panel to rack. 

Lift the panel and attach it to the rack

channels in the correct vertical rack position. Align the
holes in the ear’s short flange with the proper holes in the
rack channels. Insert the provided screws into the aligned
set of  holes, then tighten the  screws. Repeat for both ears.

 

2.2

Mounting in a 23" Rack

The panel is shipped from the factory pre-assembled. Each
panel is equipped with two, removable, L-shaped, mounting
ears (located in the bag of parts). For 23" rack mounting, the
mounting ear’s long flange attaches to the rack channel.

1.

Determine vertical position in rack. 

Determine and select

the vertical mounting location in the rack. This panel re-
quires one 

vertical 

Rack Unit (RU) in a standard Telco

relay rack.

Figure 2.  Dimensions for Rack Mounting

23” Rack Mounting

19.3"

18.3"

17"

1.75"

(1 RU)

17"

23.5"
22.3"

19” Rack Mounting

Summary of Contents for VirtualEdge VE-2848C-K6 1-RU

Page 1: ...ded inside a clear plastic packet which allows installers to label each cou pler and jack position The VE 2848C K6 comes equipped with the components shown in Table 1 Optional features in clude couple...

Page 2: ...andFigure 3 provide further details Screws to attach the mounting ears to the panel are provided as well as screws to mount the panel to a rack 2 1 Mounting in a 19 Rack The panel is shipped from the...

Page 3: ...hardware provided The ear s short flange abuts the panel 5 Attach panel to rack Lift the panel and attach it to the rack channels in the correct vertical rack position Align the holes in the ear s lon...

Page 4: ...alling Couplers Provided with the VE 2848C K6 panel is a detachable LGX type panel which contains 6 Keystone type coupler positions see Figure 8 equipped with blank hole covers Order and install coupl...

Page 5: ...C cable 32 pair male Amphenol cables field provided 3 Perform cable management on the cable per company practice using the cable tie downs on the panel s rear tray 4 Connect cable to RCV IN connector...

Page 6: ...the D ring when properly installed 4 Align the top hole of D ring hole with corresponding panel or ear hole and insert the provided screw from the back side through the aligned set of holes panel and...

Page 7: ...57 email rgmdept westell com Replacements will be shipped in the fastest manner consistent with the urgency of the situation Westell will continue to repair or replace faulty equipment beyond the warr...