
7
Before battery is connected, make sure that battery voltage is greater than 6V
so as to start up the controller. If system is 24V, make sure battery voltage is
not less than 18V. System voltage can only be automatically recognized
when controller start up for the first time.
When install fuse, make sure that the biggest distance between the fuse
holder and the positive terminal of battery is 150mm. Do not insert a fuse at
this time. Confirm the connection correct and
turn on the power.
Step 2: Load Wiring
The controller loads can be connected to such electrical equipments as lights,
pumps, motors and others. Controller offers power to loads through the
battery voltage.
Connect the positive (+) and negative (-) of loads
to controller load terminals
as shown in Figure 3-3. The load terminal may exist voltage, connect
carefully to avoid short circuit.
An in-line fuse holder should be wired in series in the load positive (+) or
negative (-) wire as show in Figure 3-3. Do not insert a fuse at this time.
Confirm the connection correct and
turn on the power.
If wiring the load connection to a load distribution panel, each load circuit
should be fused separately. The total load draw should not exceed the load
rated current of controller.
Fuse
Load
Figure 3-3 Load Wiring