Only knowledgeable, skilled personnel should perform the installation of the
Udder Gun System.
Plan Your Installation First
The four categories are:
1. Prep Station Location
2. Primary Hose Routing
3. Gun Zone and Connection Point
4. Flush Holster Location
1. Prep Station Location
Requires ample wall space for the unit to have daily access.
-
8” around all sides and 4' above floor is suggested.
Must never freeze.
Requires floor space nearby for a pre-dip chemical barrel.
-
chemical suction hose is only 6' long and needs to reach the bottom of the barrel.
Must consider primary hose routing.
-
Primary hoses need to reach from the prep station to the parlor.
-
See Primary Hose Routing
Must have dry compressed air supply, 90-100 psi at 16 cfm, ideally nearby.
Must have fresh water supply, 35-60 psi at 50̊-100̊ F, ideally nearby.
-
Do not need water if you are going to run RTU (ready to use) chemical.
Should be close to a floor drain or bucket for periodic chemical priming.
2. Primary Hose Routing
See Sample Primary Hose Layouts (Page 9)
Must never freeze.
Must not be kinked or walked on.
Must reach from the prep to the gun connection point.
Should be routed cleanly, connection points accessible, and tied or
supported every 5’.
50’ Primary Hose
25’ Primary Hose
Installation Planning
Prep Station
Summary of Contents for Udder Gun
Page 1: ...Manual UG19B MAN EN US Patent No 9 072 274 Other Patents Pending ...
Page 2: ...2 ...
Page 37: ...37 Advanced Service ...
Page 39: ...39 Trouble Shooting ...
Page 40: ...40 Trouble Shooting ...
Page 41: ...41 Trouble Shooting ...
Page 42: ...42 Udder Gun Assembly No pinch clamp on air motor fitting ...
Page 44: ...44 Gun Hose Assembly Air Pre dip Air Pre dip ...
Page 46: ...46 Prep Station Assembly ...
Page 48: ...48 Primary Hose Assembly Air Pre dip Air Pre dip Air Pre dip ...
Page 50: ...50 Flush Station Assembly ...