13
EN
SYMBOLS
OPERATING
INSTRUCTIONS
NOTE:
Before using the tool, read the instruction
book carefully.
We recommend that this tool always be
supplied via a residual current device with a
rated residual current of 30 mA or less.
For low temperatures, new power tool or
long-time storage, the machine reaches the
full impact rate only after a certain time.
This start-up time can be shortened by
striking the chisel in the machine against the
floor one time.
Point chisel (For gravel)
Standard size: 30mm (Hexagon)
Flat chisel (For crushing asphalt, grooving
and squaring)
Standard size: 30mm (Hexagon)
1. LUBRICATION MACHINE (See A)
WARNING!
Before using the machine, fill the
lubricating oil and check the oil tank regularly.
Filling lubricant oil
-Open the lubricant filler screw on the bottom of the
machine using the included spanner. Make sure not to
damage the gasket.
-Fill lubricating oil about 50g.
-Close the lubricant filler screw to check the oil level.
If the lubrication oil is in the middle of the sight glass, you
filled enough oil.
Checking the oil level
The lubricant filler screw on the bottom of the machine is
fitted with a sight glass.
-Hold the machine in the upright position so that the chisel
tip points downwards.
-Use the sight glass on the lubricant filler screw to check
the oil level.
Refill oil if you cannot see any oil through the sight glass.
To reduce the risk of injury, user must read
instruction manual
Wear ear protection
Wear eye protection
Wear dust mask
Double insulation
Warning