WERNERCO BAILEY SUPA-LITE Series Assembly Manual Download Page 3

1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
4. Install Lower Platform
5. Install Outriggers
6. Install Extension End Frames
7. Engage Spring Clips

 3055 

 3078 

8. Install Lower Diagonal Brace
9. Install Ladder
10. Install Upper Platform

11. Install Horizontal Braces
12. Install Upper Diagonal Brace
13. Install End Toe Boards
14. Install Side Toe Boards

2.3m Configuration Assembly

(Base Pack, Extension Pack, Outrigger Pack,

Toe Board Pack & Horizontal Pack)

2.3M CONFIGURATION

Base Pack + Extension Pack + Outrigger Pack + Toe Board Pack + Horizontal Pack

1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
4. Install Lower Platform
5. Install Outriggers
6. Install Extension End Frames
7. Engage Spring Clips

 3055 

 3078 

8. Install Lower Diagonal Brace
9. Install Ladder
10. Install Upper Platform

11. Install Horizontal Braces
12. Install Upper Diagonal Brace
13. Install End Toe Boards
14. Install Side Toe Boards

2.3m Configuration Assembly

(Base Pack, Extension Pack, Outrigger Pack,

Toe Board Pack & Horizontal Pack)

1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
4. Install Lower Platform
5. Install Outriggers
6. Install Extension End Frames
7. Engage Spring Clips

 3055 

 3078 

8. Install Lower Diagonal Brace
9. Install Ladder
10. Install Upper Platform

11. Install Horizontal Braces
12. Install Upper Diagonal Brace
13. Install End Toe Boards
14. Install Side Toe Boards

2.3m Configuration Assembly

(Base Pack, Extension Pack, Outrigger Pack,

Toe Board Pack & Horizontal Pack)

1. Unfold Base Pack
2. Lock Brace Locks
3. Lock Castors
4. Install Lower Platform
5. Install Outriggers
6. Install Extension End Frames
7. Engage Spring Clips

 3055 

 3078 

8. Install Lower Diagonal Brace
9. Install Ladder
10. Install Upper Platform

11. Install Horizontal Braces
12. Install Upper Diagonal Brace
13. Install End Toe Boards
14. Install Side Toe Boards

2.3m Configuration Assembly

(Base Pack, Extension Pack, Outrigger Pack,

Toe Board Pack & Horizontal Pack)

3

1.

   Unfold Base Pack

2.

   Lock Brace Locks

3.

   Lock Castors

4.

   Install Lower Platform

5.

   Install Outriggers

6.

   Install Extension

      End Frames

7.

   Engage Spring Clips

8.

   Install Lower Diagonal

      Brace (BLUE)

9.

   Install Ladder

10.

   Install Upper Platform

11.

    Install Horizontal Braces

        (YELLOW)

12.

   Install Upper Diagonal

        Brace (BLUE)

13.

   Install End Toe Boards

14.

   Install Side Toe Boards

Summary of Contents for BAILEY SUPA-LITE Series

Page 1: ... Pack Guardrail Pack Toe Board Pack ASSEMBLY MANUAL READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING WORK WARNING Failure to comply with all instructions may result in serious injury Before assembling this product identify all components If any components are missing or damaged return to the place of purchase Do not substitute any components ATTENTION This product is to be stored in a clean dry ...

Page 2: ...il End Frames 2 Engage Spring Clips 3 Install Horizontal Braces 4 Install End Toe Boards 5 Install Side Toe Boards ENGAGED Install Horizontal Braces on the inside of the Standards 1 5m Configuration Assembly Base Pack 1 5m Configuration Assembly Base Pack Guardrail Pack Toe Board Pack UNLOCKED UNLOCKED LOCKED LOCKED 1 Unfold Base Pack 2 Lock Brace Locks 3 Lock Castors UNLOCKED LOCKED UNLOCKED LOCK...

Page 3: ...ocks 3 Lock Castors 4 Install Lower Platform 5 Install Outriggers 6 Install Extension End Frames 7 Engage Spring Clips 3055 3078 8 Install Lower Diagonal Brace 9 Install Ladder 10 Install Upper Platform 11 Install Horizontal Braces 12 Install Upper Diagonal Brace 13 Install End Toe Boards 14 Install Side Toe Boards 2 3m Configuration Assembly Base Pack Extension Pack Outrigger Pack Toe Board Pack ...

Page 4: ...tension End Frames 7 Engage Spring Clips 3055 3078 8 Install Diagonal Braces 9 Install Guardrail End Frames 10 Engage Spring Clips 11 Install Ladder 12 Install Upper Platform 13 Install Horizontal Braces 14 Install End Toe Boards 15 Install Side Toe Boards 3 4m Configuration Assembly Base Pack Extension Pack Outrigger Pack Guardrail Pack Toe Board Pack 1 Unfold Base Pack 2 Lock Brace Locks 3 Lock ...

Reviews: