background image

WELDMAX

- 7

 

-

MIG S 

(3-phase)

 + SWF 2

The machine is controlled by an  

electronic unit

  which provides the 

feeding motor's DC voltage, switches the 

contactor

 and 

gas valve

 on/off 

and controls the welding process.

Green LED: signals the machine's on.

Yellow LED: signals the overheating of the 

power source

.

K: Function selector switch.

P4: Wire feed speed potentiometer.

P7: Welding 

on

 time potentiometer.

P8: Welding 

off

 time potentiometer.

P1: Wire burn back (mini) potentiometer.

P2: Gas post-flow time (mini) potentiometer.

Two operation modes which can be chosen by the switch K are:

 

Wire threading

: While 

pushing

 the torch button, the feeder is 

feeding 

the wire with speed approx. 10 m/min. into the torch cable (any other functions are prohibited). For 
smooth wire feed, keep torch cable as 

straight

 as possible during this operation. In case of 

slippage 

of the wire, increase drive roll pressure by the set screw.

Gas   test

:   While  

pushing

  the   torch   button,  the   gas   valve   is  

open

  (any   other   functions   are 

prohibited). During this time the quantity and the pressure of gas can be checked and set. Set gas 
flow between approx. 16-20 l/min (

depending

 on the welding current).

The welding can be started by pushing the button on the welding torch:

First there is only 

gas pre-flow

 (its duration can be 0-0.5 sec., setting by P3 potentiometer on the PCB);

Afterwards the 

wire feeding

 begins, with soft start (its duration is set to 0.2 sec. by P9 on PCB), and also the 

welding current

 starts.

The welding work is according to the operation modes set by the function selector switch (K):

 

4-stroke

 

mode: Releasing the button the welding 

continues

 and it stops only if the button is pushed 

again.

 

2-stroke

 

mode: After releasing the button, the welding 

stops

.

 

Spot welding

:  After the set time is finished (or  releasing the button),  the welding stops. The 

duration of the spot welding can be set by P7 potentiometer (0.5-2.5 sec).

 

Interval welding

: The welding stops if the button is 

released 

in the pause time. The duration of the 

feeding

 can be set by P7, while the 

pause

 time can be set by P8.

When the welding is finished:

First the 

wire feeding

 stops (if it works);

Elapsing the wire burn back time (P1), the 

welding current

 ceases;

Elapsing the gas post-flow time (P2), the 

gas flow

 stops, too.

The P6 potentiometer 

on the PCB

 sets the minimal wire speed, while the P5 sets the maximal one.

6. Trouble shooting

All repair works are needed to be carried out by a 

technician

, on 

disconnected

 machine!

If the fault of the equipment remains or is caused by an 

unknown

 reason, contact the service division!

The green LED is off:

 

  Faulty switch (Q1), mains cable or transformer(s); 

 replace it or contact the service. 

Bad electric connections to the 

power source

 

check

 these cables.

Blown fuse:

 

  

 Find the 

cause

 of trouble (short circuit may be inside!), replace fuse and 

check

 its rating.

The yellow LED is on:

 

  The 

power source

 is overheated; 

 

wait

 until the fan cools it down and the LED 

extinguishes.

No welding arc:

 

  Faulty torch or its cable or button;  

 

replace

 it. Loose connection at welding cables; 

⇒ 

fasten

 it. Faulty control unit; 

 contact service.

M I G / M A G   P o w e r   S o u r c e   w i t h   s e p a r a t e   W i r e   F e e d e r

Green

LED

Yellow

LED

K

P7

P1

P2

P8

P4

1

2

3

4

5

6

7

9

8

10

PROGRAMME

S

S

0,5

1,5

2,5  sec.

0,5

1,5

2,5  sec.

WELD

Summary of Contents for KWM295SWF

Page 1: ...WELDMAX 1 MIG S 3 phase SWF 2 M I G M A G P o w e r S o u r c e w i t h s e p a r a t e W i r e F e e d e r...

Page 2: ...WELDMAX 2 MIG S 3 phase SWF 2 M I G M A G P o w e r S o u r c e w i t h s e p a r a t e W i r e F e e d e r...

Page 3: ...WELDMAX 3 MIG S 3 phase SWF 2 M I G M A G P o w e r S o u r c e w i t h s e p a r a t e W i r e F e e d e r...

Page 4: ...Introduction 5 2 Specification 5 3 Transport and storage 5 4 Installation 6 5 Operation 6 6 Trouble shooting 7 7 Maintenance 8 8 Parts list 8 9 Circuit diagram 10 M I G M A G P o w e r S o u r c e w i...

Page 5: ...nit with motor Rectifier bridge Solenoid gas valve Choke for smoothing the current Electronic control unit Auxiliary transformer and contactor Connecting cables and hoses 10 m 2 Specification Power So...

Page 6: ...art of the wire into the central adaptor Finally put the cover back to protect the wire reel and the feeding unit against contamination Connect the wire feeder to the power source by welding and contr...

Page 7: ...selector switch K 4 stroke mode Releasing the button the welding continues and it stops only if the button is pushed again 2 stroke mode After releasing the button the welding stops Spot welding After...

Page 8: ...an be carried out by a trained personnel only on equipment disconnected from the mains Don t touch the inside electric parts under voltage The electric shock prevention tests must be carried out regul...

Page 9: ...sformer T1 1 29080495 22 Rectifier bridge PTS 390 V1 1 2142240233 23 DC choke L1 1 29090296 24 Output socket CX 31 3 2142240068 25 Fuse B20 5 2 3 15A feeder F4 2 2343730049 26 Lamp holder 18 18 LJ 243...

Page 10: ...WELDMAX 10 MIG S 3 phase SWF 2 9 Circuit diagram M I G M A G P o w e r S o u r c e w i t h s e p a r a t e W i r e F e e d e r...