8
Figure 4: Outside connection diagram of ARC series
(1)
Ensure firmly connection to welding cable.
(2)
Connect to remote controller if needed.
(3)
Adjust every knobs and switches on the front panel to proper position in line with selected
mode.
(4)
Turn on the circuit breaker on the power source.
(5)
Connect input 3 phase power cable to switch box.
Attention:
Before you plug the welding cable, please turn off the power and rightly calibrate the plug key
to the socket slot at first, then insert and turn the plug clockwise until it firmly seated. Make sure the plug
and the socket are well-connected to be sound conductivity in case that they are burnt out by over
resistance heat.