Fluid End Removal:
1. Disconnect suction and discharge manifolds lines, plunger lube lines and plunger lube check valves,
and pressure transducer electrical lines.
a) Remove Plunger Clamps using a pneumatic/ratchet wrench and a 3/8" Hex Bit.
2. Ensure that the
two SPM
®
provided lifting eyes
are installed and torqued per engineering drawing,
attach lifting chain and overhead hoist (5 Ton minimum capacity) to prevent Fluid End from falling off the
Power End. See Lifting Requirements section. Remove the slack from the lifting chains.
3. Using a 2
3/4
wrench, remove the twenty 1
3/4
nuts which secure the fluid cylinder to the power end stay
rods. Remove the fluid cylinder from the power end.
4. Set the fluid end on a pallet up right
5. Inspect the face of the fluid cylinder for wear of fretting around the stay rod holes. Inspect the shoulders
of the stay rods for wear or cracks. For Duralast
®
fluid end installation procedures, refer to the
SPM
®
Duralast Fluid End operation and instruction service manual
(SPM
®
document number 2P130492)
Summary of Contents for SPM QWS 2500 XL
Page 12: ...12 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR Performance Data ...
Page 13: ...13 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR ...
Page 14: ...14 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR ...
Page 15: ...15 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR ...
Page 16: ...16 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR ...
Page 17: ...17 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR ...
Page 18: ...18 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR ...
Page 22: ...22 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR ...
Page 23: ...23 of 44 Document P N 2P137414 Release Date 05 29 2017 Revision IR ...