Weil-McLain Evergreen 220 Manual Download Page 3

Part number 

550-100-268/1220

3

  

CONDENSING

 

GAS

 

BOILER

 — 

 V

ENT

 A

DDENDUM

 Direct  Exhaust 

(Category II Only) Venting – general

Evergreen Boilers must be vented 

and supplied with combustion and 

ventilation air using piping and 

methods described in this adden-

dum

.

Inspect fi nished vent and air piping thor-
oughly to ensure all are water-tight and 
comply with the instructions provided 
and with all requirements of applicable 
codes.

Failure to provide a properly-installed 
vent and air system will cause severe 
personal injury or death.

If the vent/air piping configurations 
covered in the 

Evergreen

 boiler manual 

and this addendum cannot be applied 
for a particular installation, contact Weil-
McLain for assistance. Other confi gura-
tions may be available.

Installations must comply with local 
requirements and with the National 
Fuel Gas Code, ANSI Z223.1 for U.S. 
installations or CSA B149.1 or B149.2 for 
Canadian installations.

Use only the materials listed in the Boiler 
manual for vent and air pipe and fi ttings. 
Failure to comply could result in severe 
personal injury, death or substantial 
property damage.

If used, a masonry chimney can 

ONLY be used as a PIPE CHASE for 

vent pipe

 — The vent piping must be in-

stalled as instructed in this manual and all 
joints must be sealed. The chimney must 
be used only for   boilers. NO OTHER 
appliance or fi replace can be connected 
to the chimney.

The chimney must be straight, with 
no offsets, and the vent and air piping 
materials must comply with this instruc-
tion manual. The chimney must be fi tted 
with a sealed access opening, through 
which the interior of the chimney can 
be inspected. The chimney (and liner, if 
installed) must be inspected at least once 
annually to verify condition.

Failure to comply could result in severe 
personal injury, death or substantial 
property damage.

Vent piping

Boiler fl ue gases must be piped from the boiler to outside, following 

the instructions in the Boiler manual and this addendum, and 

compliant with all applicable codes. 

Combustion and ventilation air openings

(direct exhaust installations)

Combustion and ventilation air are provided from the boiler room 

on direct exhaust installations. Follow all instructions in the Boiler 

manual and this addendum, plus all applicable codes, to provide 

required air openings.

Vent termination options

Vent piping must terminate out through the roof of the building, 

using only one of the methods described in the Boiler manual and 

this addendum.

Vent pipe diameter

A 6” vent pipe diameter must be used. 

Vent pipe minimum length

Direct exhaust — no minimum.

Vent and air piping materials

See the 

Evergreen

 Boiler Manual for approved vent and air piping 

materials, for 

direct exhaust

.

Use the same vent or air piping material through-

out.

 — Do not connect different types of piping to-

gether.

Install a bird screen in each vent pipe termination (coupling or elbow).  

Bird screens are not supplied with the 

Evergreen

 boiler. Purchase 

separately from Weil-McLain.

Summary of Contents for Evergreen 220

Page 1: ...ion includes requires The Vent system for a Category II Evergreen boiler is considered a Designed Engineered vent system and should be designed by a professional using accepted engineering practices i...

Page 2: ...of a Double Acting Barometric Damper or Modulating Damper to en sure the appropriate negative pressure range is kept for Category II venting The use of this device should be considered in any Enginee...

Page 3: ...The chimney must be straight with no offsets and the vent and air piping materials must comply with this instruc tion manual The chimney must be fitted with a sealed access opening through which the i...

Page 4: ...Code for dealing with other con ditions Free area louver allowance The free area of openings means the area after reduction for any installed louvers or grilles Be sure to consider this reduction when...

Page 5: ...household laundry rooms Adhesives used to fasten building products and other similar products Excessive dust and dirt Areas likely to have contaminants Dry cleaning laundry areas and establishments S...

Page 6: ...e inch per 3 000 Btuh of all other appliances in the room TWO openings each at least 1 square inch per 4 000 Btuh of all other appliances in the room OR ONE opening each at least 1 square inch per 3 0...

Page 7: ...e roof the annular space around the penetration must be permanently sealed using approved materials to prevent entry of combus tion products into the building 6 Locate terminations so they are not lik...

Page 8: ...rs where required at the boiler vent connection 3 See page 36 of Evergreen Boiler Manual for attaching vent and air pipes at the boiler 4 Cut pipe to required lengths 5 Deburr inside and outside of pi...

Reviews: