"OILERMANUALs)NSTALLATIONs3TART5Ps-AINTENANCEs0ARTS
13
Part No. 550-100-068/1009
Cleanout plate assembly
&IGURE
Complete block assembly
(continued)
The boiler contains ceramic fiber and
fiberglass materials. Use care when han-
dling these materials per instructions on
page 34 of this manual. Failure to comply
could result in severe personal injury.
DO NOT insert a bottom HXT-bar into the opening
between the FRONT section and the first intermediate
section.
To remove flue HXT-bars when required to clean the boiler
3.
flueways, grab the end of each HXT-bar with pliers and pull
straight out. Clean HXT-bars and replace as shown in Fig-
ure 12, page 12.
Install cleanout plates
Cleanout plates must be installed gas-tight to prevent
possibility of flue gas leakage and carbon monox-
ide emissions, resulting in severe personal injury or
death.
See
1. Figure
13.
Position two ¼" x 1¾" carriage bolts in cleanout opening, be-
2.
tween the cleanout plate bosses, as shown. Secure with washers
and nuts.
Place woven fiberglass gasket over carriage bolts.
3.
Mount cleanout plate over opening. Secure with nuts and wash-
4.
ers.
Repeat steps 1 through 3 for remaining cleanout plates.
5.
Install draft hood collar
Install
1.
1
/
8
" continuous bead of sealing rope adhesive in groove on
draft hood collar.
Position ½" sealing rope in groove. Overlap ends of rope at least
2.
1 inch.
Mount collar over flueway outlet on back section. Secure with ½
3.
x 1½" hex head cap screws and washers.