11
17. Attach the Left Pull-up Arm (75) and the Right
Pull-up Arm (77) to the Assist Upright (74)
with two 5/16” x 2 3/4” Bolts (11) and two
5/16” Nylon Locknuts (3).
Attach the Left Dip Arm (78) and the Right Dip
Arm (79) to the Assist Upright (74) with two
5/16” x 2 3/4” Bolts (11) and two 5/16” Nylon
Locknuts (3).
Wet the end of the Left Pull-up Arm (75) with
soapy water. Slide a Long Handgrip (80) onto
the Left Pull-up Arm.
Slide a Long Handgrip (80) onto the Right
Pull-up Arm (77), onto the Left Dip Arm (78),
and onto the Right Dip Arm (79) in the same
manner.
Press two 1 1/4” Round Inner Caps (109) into
the Left Pull-up Arm (75) and into the Right
Pull-up Arm (77).
Press a 1 1/4” Round Inner Cap (109) into the
Left Dip Arm (78), and into the Right Dip Arm
(79).
18.
Locate and open the parts bags labeled
“CABLE ASSEMBLY” and “PULLEYS.”
During steps 19 through 39, refer to the
CABLE DIAGRAMS on pages 26–27 of this
manual to verify proper cable routing. Before
beginning this section, fully unwind the four
Cables. Identify the four Cables by comparing
the lengths and ends of the Cables. The
approximate length of each Cable is listed (in
inches) after the key number in the drawing.
IMPORTANT: While assembling the cables,
do not overtighten the bolts and nuts
attaching the pulleys. The pulleys must be
able to turn freely.
19.
Locate the High Cable (58).
Wrap the High
Cable around a 3 1/2” Pulley (15). Attach the
Pulley to the Top Frame (55) with a 3/8” x
3 3/4” Bolt (88) and a 3/8” Nylon Locknut (21).
Be sure that the end of the Cable with the
ball is on the indicated side of the Pulley
and that the Cable is between the Pulley
and the hook.
19
55
21
58
Ball
Hook
17
75
74
78
18
23—78.5”
58—146.25”
72—190”
99—64”
ARM ASSEMBL
Y
CABLE ASSEMBL
Y
11
109
109
109
109
11
77
80
80
80
80
3
3
3
15
88
109
79