![Weco LV-HUB GEN-02 Manual Download Page 26](http://html1.mh-extra.com/html/weco/lv-hub-gen-02/lv-hub-gen-02_manual_949487026.webp)
LV-HUB V2.01 14/06/2022
Select the number of clusters and the number of batteries each cluster and press SET to confirm
As last step it is mandatory to select the inverter protocol ( turn on the inverter to enable the communication between LV HUB
and Inverter, if the Inverter is not active or the communication cable ( BMS /CAN ) between the inverter and LV HUB is not
connected, the LV HUB with display a FAULT and the Green Light will Blink