WeCo 5K3-LV-HV
HeSU 5K3-LV HV
Page 9 of 69
V_1.1_21-Nov-2020_LV-HV
The mechanical installation method for the 5K3 LV-HV modules can be considered ‘’ conceptually’’ the
same for HV and LV configurations
The installer who intends to install the 5K3 LV-HV module in the HV configuration shall read this entire
manual including the HV configuration information included in Section-3 of this manual
SECTION-1: INSTALLATION & PRE-OPERATIONAL PROCEDURES
1.1 Module Handling and Lift Out from Box
The battery is always delivered in WALL mode and it is therefore necessary for the installer to make simple changes to
install the STACK kit. Below are the installation phases.
ATTENTION
The battery must be lift by 4 persons by using the 4 handles
2 Handles are inbuilt and the other two are provided as temporary handles to be used as shown below
Open the carton box, find the portable and retractable handles, position them and proceed with the lifting up.