5.3.2 Installation/Assembly Method
5.3.2.1 Installation of accessories and preparatory phases
Phase 1: Choose the support surface carefully, the batteries have a weight of over 50 kg each and can reach 270 kg
including the accessories, in a stack of five batteries.
The surface profile of the battery on the ground is 55cm x 46cm but the actual contact with the ground is made by 4
supports of about 4x10 cm each.
Make sure the support surface is adequate to support the overall battery load.
Information
:
Preparation of the modules
The battery is delivered as standard in a
WALL MOUNT CONFIGURATION
and it is therefore necessary that the installer
make simple external changes to install the
STACK KIT.
STACK MOUNT INSTALLATION PHASES FOLLOW
1.
Install the support feet on the back of the battery using the supplied screws. Each foot must be
installed with 2 M8 Allen screws supplied. Repeat the operation for all the batteries you want to stack.